Difference between revisions of "Staff Priorities - Fabio"
From SCECpedia
Jump to navigationJump to searchLine 1: | Line 1: | ||
== Yesterday: == | == Yesterday: == | ||
− | * | + | * Contacted TACC regarding account |
− | * | + | * Revised acceptance test script |
− | ** | + | ** Purged old tests from svn |
− | * | + | * Checked new workflow generator into svn |
− | * | + | * Generated new BBP package |
− | + | ** Sent it to KA and PM | |
− | |||
− | * | ||
− | * | ||
== Today: == | == Today: == | ||
− | * | + | * Look into integrating the environment metadata code into broadband |
− | * | + | * Study the arias duration code |
− | * | + | * PyCon follow-ups |
− | |||
== Blocked: == | == Blocked: == | ||
Line 22: | Line 18: | ||
== Followups: == | == Followups: == | ||
− | * | + | * No |
− |
Revision as of 17:20, 18 March 2013
Contents
Yesterday:
- Contacted TACC regarding account
- Revised acceptance test script
- Purged old tests from svn
- Checked new workflow generator into svn
- Generated new BBP package
- Sent it to KA and PM
Today:
- Look into integrating the environment metadata code into broadband
- Study the arias duration code
- PyCon follow-ups
Blocked:
- No
Followups:
- No