Difference between revisions of "Staff Priorities - Phil"
From SCECpedia
Jump to navigationJump to searchLine 1: | Line 1: | ||
== Yesterday: == | == Yesterday: == | ||
− | * | + | * Repair and restore files to Mac Laptop |
− | * | + | * BBP Call with PS and CG |
− | * | + | * GPU call with YC and Titan group |
− | |||
− | |||
== Today: == | == Today: == | ||
− | * | + | * CSEP Telecon |
− | * | + | * |
− | + | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
== Blocked: == | == Blocked: == | ||
Line 25: | Line 16: | ||
== Pending: == | == Pending: == | ||
− | |||
− | |||
* CVM Evaluation system differences | * CVM Evaluation system differences | ||
* SRC files posted for SGS | * SRC files posted for SGS |
Revision as of 17:03, 17 April 2013
Contents
Yesterday:
- Repair and restore files to Mac Laptop
- BBP Call with PS and CG
- GPU call with YC and Titan group
Today:
- CSEP Telecon
Blocked:
- No
Followups:
- No
Pending:
- CVM Evaluation system differences
- SRC files posted for SGS