Difference between revisions of "Staff Priorities - Scott"
From SCECpedia
Jump to navigationJump to searchLine 1: | Line 1: | ||
== Yesterday == | == Yesterday == | ||
*Blue Waters | *Blue Waters | ||
− | ** | + | **Reformatted GPU SGTs for calculating hazard curve |
− | * | + | *Stampede |
− | * | + | **Calculated GPU hazard curve - matches almost exactly! |
+ | *Started zipping 2011-12 CyberShake runs | ||
== Today == | == Today == | ||
*Blue Waters | *Blue Waters | ||
− | ** | + | **Back to work on coscheduling |
− | * | + | **Get site list for Study 13.4, start the run |
− | * | + | *Email GPU hazard curve results out |
− | + | *Monitor zipping | |
+ | *Modify stage-out location to scec-04 | ||
== Blocked == | == Blocked == | ||
Line 17: | Line 19: | ||
== Follow-ups == | == Follow-ups == | ||
*GB call? | *GB call? | ||
+ | *CyberShake technical call | ||
+ | |||
Check on SA forward sim | Check on SA forward sim |
Revision as of 17:52, 17 April 2013
Yesterday
- Blue Waters
- Reformatted GPU SGTs for calculating hazard curve
- Stampede
- Calculated GPU hazard curve - matches almost exactly!
- Started zipping 2011-12 CyberShake runs
Today
- Blue Waters
- Back to work on coscheduling
- Get site list for Study 13.4, start the run
- Email GPU hazard curve results out
- Monitor zipping
- Modify stage-out location to scec-04
Blocked
- No
Follow-ups
- GB call?
- CyberShake technical call
Check on SA forward sim
Email Stampede staff, let them know about node crashing solution
Finish wiki entries for Stampede and Blue Waters validation
Areas of Responsibilities
- CyberShake 1.4
- Broadband CyberShake
- Code migration