Difference between revisions of "Staff Priorities - Phil"

From SCECpedia
Jump to navigationJump to search
Line 5: Line 5:
 
== Today: ==
 
== Today: ==
 
* Finalize CME meeting
 
* Finalize CME meeting
 +
* Finalize Fairbanks meeting
 
* Talk about workflows for BBP with Fabio
 
* Talk about workflows for BBP with Fabio
 +
* Prepare Q1 ShakeAlert report
 +
* Follow-up with GB Paper
 
*  
 
*  
  

Revision as of 16:42, 29 April 2013

Yesterday:

  • BBP Call with PS and CG
  • GPU paper turned in

Today:

  • Finalize CME meeting
  • Finalize Fairbanks meeting
  • Talk about workflows for BBP with Fabio
  • Prepare Q1 ShakeAlert report
  • Follow-up with GB Paper


Blocked:

  • No

Followups:

  • No

Pending:

  • CVM Evaluation system differences
  • SRC files posted for SGS