Difference between revisions of "Staff Priorities - Phil"

From SCECpedia
Jump to navigationJump to search
Line 12: Line 12:
 
* Update SEISM Metrics
 
* Update SEISM Metrics
 
* NCAR data sharing plans
 
* NCAR data sharing plans
 
+
* SRC files posted for SGS
  
 
== Blocked: ==
 
== Blocked: ==
Line 22: Line 22:
 
== Pending: ==
 
== Pending: ==
 
* CVM Evaluation system differences
 
* CVM Evaluation system differences
* SRC files posted for SGS
 

Revision as of 16:45, 29 April 2013

Yesterday:

  • BBP Call with PS and CG
  • GPU paper turned in

Today:

  • Finalize CME meeting
  • Finalize Fairbanks meeting
  • Talk about workflows for BBP with Fabio
  • Prepare Q1 ShakeAlert report
  • Follow-up with GB Paper
  • Ergo check
  • Update SEISM Metrics
  • NCAR data sharing plans
  • SRC files posted for SGS

Blocked:

  • No

Followups:

  • No

Pending:

  • CVM Evaluation system differences