Difference between revisions of "Staff Priorities - Fabio"

From SCECpedia
Jump to navigationJump to search
Line 1: Line 1:
 
== Yesterday: ==
 
== Yesterday: ==
  
* Created combined bias plot code
+
* Fixed issue so that link to xml file is part of the html index file
** Post-processes realizations and creates a combined bias plot
+
* Fixed gp_gof unit test so that it works now
** Showed results to CG, took suggestions
+
* Created BBP 13.5.0 distribution
** Code finished and checked into svn
+
** Created source distribution and GF/VAL packages
* CSM Method
+
** Moved code to epicenter, updated install
** Generated results for all 5 california events for part A
+
* Skype call with SC to get him set up with BBP on epicenter
** Created combined plots, ranking file
+
* Started Broadband 13.5 Study on epicenter
** Sent results to JA
+
* Got UCSB code from JC
** Got code update from JA with fix to green's function generator bug
+
* Reset Broadband.usc.edu server (down since last night)
** Update BBP version, patch fixes GF code's bug
 
* Irikura method
 
** Got filter details from JB
 
** Worked on converting 1-component Irikura file to BBP seismograms
 
* Talked to JC
 
** Provided instructions on how to run on cluster
 
** Got JC set up on epicenter, ready to go
 
* Worked with KO and RS to fix SDSU method
 
** Got fixes for 2 bugs in the SDSU code
 
** Code still produces different low-frequency seismograms
 
* ExSIM method
 
** Received e-mail from KA regarding ExSIM's parameters
 
** Follow-up with KA and CG to clarify per-event issues
 
  
 
== Today: ==
 
== Today: ==
  
* Finish Irikura code, run simulations on epicenter for part A and part B
+
* Monitor production runs
* Waiting for SDSU code update
+
** Move data to hypocenter as runs complete
* Ran last GMPE scenario for CSM method, send results to JA
+
* Look at JC's code
 +
* Clean up hypocenter/epicenter old runs
  
 
== Blocked: ==
 
== Blocked: ==
Line 34: Line 22:
  
 
== Followups: ==
 
== Followups: ==
* SEISM call @ 11am
+
* Cybershake calls @ 11am
* EXSIM call with CG and KA @ 1pm
 

Revision as of 17:12, 15 May 2013

Yesterday:

  • Fixed issue so that link to xml file is part of the html index file
  • Fixed gp_gof unit test so that it works now
  • Created BBP 13.5.0 distribution
    • Created source distribution and GF/VAL packages
    • Moved code to epicenter, updated install
  • Skype call with SC to get him set up with BBP on epicenter
  • Started Broadband 13.5 Study on epicenter
  • Got UCSB code from JC
  • Reset Broadband.usc.edu server (down since last night)

Today:

  • Monitor production runs
    • Move data to hypocenter as runs complete
  • Look at JC's code
  • Clean up hypocenter/epicenter old runs

Blocked:

  • No

Followups:

  • Cybershake calls @ 11am