== Yesterday == | == Yesterday == | ||
*Blue Waters: | *Blue Waters: | ||
− | ** | + | **Monitored production runs |
− | ** | + | **Continue testing and getting performance numbers for revised extraction jobs - found and fixed bug |
+ | **Pointed Efecan towards 1 Hz run | ||
+ | *Stampede: | ||
+ | **Continued work on offloading code | ||
+ | *Sent out map with locations of sites with all four permutations from Study 13.4 | ||
+ | *Sent out curve diff | ||
== Today == | == Today == | ||
*Blue Waters: | *Blue Waters: | ||
− | ** | + | **Continue monitoring production runs |
− | ** | + | **Point Efecan and Liwen towards coscheduling and post-processing |
*Stampede: | *Stampede: | ||
**Continue work on offloading code | **Continue work on offloading code | ||
− | * | + | *Identify largest-difference curves, send out plots |
== Blocked == | == Blocked == | ||
Line 16: | Line 21: | ||
== Follow-ups == | == Follow-ups == | ||
− | * | + | *Phil and David - 12-1 |
− | |||
Revision as of 17:38, 10 May 2013
Yesterday
- Blue Waters:
- Monitored production runs
- Continue testing and getting performance numbers for revised extraction jobs - found and fixed bug
- Pointed Efecan towards 1 Hz run
- Stampede:
- Continued work on offloading code
- Sent out map with locations of sites with all four permutations from Study 13.4
- Sent out curve diff
Today
- Blue Waters:
- Continue monitoring production runs
- Point Efecan and Liwen towards coscheduling and post-processing
- Stampede:
- Continue work on offloading code
- Identify largest-difference curves, send out plots
Blocked
- No
Follow-ups
- Phil and David - 12-1
Finish wiki entries for Stampede and Blue Waters validation
Areas of Responsibilities
- CyberShake 1.4
- Broadband CyberShake
- Code migration