Difference between revisions of "Staff Priorities - Scott"

From SCECpedia
Jump to navigationJump to search
Line 1: Line 1:
 
== Yesterday ==
 
== Yesterday ==
*Worked on intern presentations
+
*Call with Omar
*Continued running workflows - 3 left
+
*CyberShake call
*Put performance metrics on wiki
+
*Caught an issue with Study 13.4 maps;  David regenerated
*Put SCEC storage estimates sent to John on wiki
+
*Looked over rebuttal
  
 
== Today ==
 
== Today ==
*Email Omar about filled up quota
+
*Send large DAX to Karan
*Mine for more complex SGT metrics
+
*Reply to NCSA about GRAM meeting
*Send Liwen map values used to interpolate
+
*Mine for Study 13.4 metrics
*Resume populating monitord db with Study 2.2 results
+
*Continue populating monitord db with Study 2.2 results
  
 
== Blocked ==
 
== Blocked ==
Line 15: Line 15:
  
 
== Follow-ups ==  
 
== Follow-ups ==  
*Intern discussion about Grand Challenge
+
*Phil at 2
  
 
== Areas of Responsibilities ==
 
== Areas of Responsibilities ==

Revision as of 17:19, 20 June 2013

Yesterday

  • Call with Omar
  • CyberShake call
  • Caught an issue with Study 13.4 maps; David regenerated
  • Looked over rebuttal

Today

  • Send large DAX to Karan
  • Reply to NCSA about GRAM meeting
  • Mine for Study 13.4 metrics
  • Continue populating monitord db with Study 2.2 results

Blocked

  • No

Follow-ups

  • Phil at 2

Areas of Responsibilities

  • CyberShake 1.4
  • Broadband CyberShake
  • Code migration