Difference between revisions of "Staff Priorities - Scott"

From SCECpedia
Jump to navigationJump to search
Line 1: Line 1:
 
== Yesterday ==
 
== Yesterday ==
*Finished refactoring and testing PP workflow, to the extent possible
+
*Tested workflows on Stampede - PP passes, still working on Integrated
*Tested integrated workflow
+
*Discovered we need to populate RuptureVariations table in DB for ERF 36
*Answered En-Jui's question about UCVM
+
*CyberShake calls
*Replied to Yifeng about coscheduling for SC paper
+
*Follow-up with Phil
 +
*Worked on UCVM improvements for 1 Hz
  
 
== Today ==
 
== Today ==
 +
*Respond to Marine
 +
*Continue testing integrated workflow
 
*Work with 1 Hz rupture surfaces on HPC
 
*Work with 1 Hz rupture surfaces on HPC
 +
*Run pegasus-statistics on Study 2.2 results
  
 
== Blocked ==
 
== Blocked ==

Revision as of 17:03, 15 August 2013

Yesterday

  • Tested workflows on Stampede - PP passes, still working on Integrated
  • Discovered we need to populate RuptureVariations table in DB for ERF 36
  • CyberShake calls
  • Follow-up with Phil
  • Worked on UCVM improvements for 1 Hz

Today

  • Respond to Marine
  • Continue testing integrated workflow
  • Work with 1 Hz rupture surfaces on HPC
  • Run pegasus-statistics on Study 2.2 results

Blocked

  • No

Follow-ups

  • No

Areas of Responsibilities

  • CyberShake 1.4
  • Broadband CyberShake
  • Code migration