Difference between revisions of "Staff Priorities - Scott"

From SCECpedia
Jump to navigationJump to search
Line 1: Line 1:
 
== Yesterday ==
 
== Yesterday ==
*Resumed 2s SA db insertion
+
*Emailed blurb to Mats
*Compared 1 Hz and 0.5 Hz SGTs, look good
+
*Finished 2s SA db inserts, emailed Tom and Feng
*Came up with ideas for reducing PP memory requirements
+
*Emailed slides to Tom summarizing CyberShake progress in the past year
*Calculated BW TEST curve with workflow tools, matches reference
+
*Tried BBP, MOGof unit test took forever
*Asked HPCC to add BW proxy to grid-mapfile
+
*Queued up full-scale curve on BW
 +
*CyberShake calls
 +
*Meeting with John Yu
  
 
== Today ==
 
== Today ==
*Summary for Mats
+
*Work on poster
*Try synthesizing single seismograms with 1 Hz and 0.5 Hz SGTs, do comparison
+
*Try BBP RC2
 +
*Try synthesizing single seismograms with 1 Hz and 0.5 Hz SGTs, do comparison, check into large memory nodes
 
*Test AWP-ODC-SGT GPU with modified output format
 
*Test AWP-ODC-SGT GPU with modified output format
*Work on poster
+
*Check on full-scale BW
*Monitor 2s SA db inserts
 
*Retry UCVM
 
*Try BBP when the RC is posted
 
*Run full-scale curve on BW
 
*Generate PPT for Tom summarizing CyberShake progress in the past year
 
  
 
== Blocked ==
 
== Blocked ==
Line 21: Line 19:
  
 
== Follow-ups ==  
 
== Follow-ups ==  
*CyberShake calls at 11
+
*No
*Skype with John Yu at 1
 
  
 
== Areas of Responsibilities ==
 
== Areas of Responsibilities ==

Revision as of 19:49, 5 September 2013

Yesterday

  • Emailed blurb to Mats
  • Finished 2s SA db inserts, emailed Tom and Feng
  • Emailed slides to Tom summarizing CyberShake progress in the past year
  • Tried BBP, MOGof unit test took forever
  • Queued up full-scale curve on BW
  • CyberShake calls
  • Meeting with John Yu

Today

  • Work on poster
  • Try BBP RC2
  • Try synthesizing single seismograms with 1 Hz and 0.5 Hz SGTs, do comparison, check into large memory nodes
  • Test AWP-ODC-SGT GPU with modified output format
  • Check on full-scale BW

Blocked

  • No

Follow-ups

  • No

Areas of Responsibilities

  • CyberShake 1.4
  • Broadband CyberShake
  • Code migration