Difference between revisions of "Staff Priorities - Fabio"

From SCECpedia
Jump to navigationJump to search
Line 1: Line 1:
 
== Yesterday: ==
 
== Yesterday: ==
  
* Got SG set up and working with BBP 13.9.0
+
* Sent proposed list of broadband-all users to PM
* Finalized DT plan with RG
+
* Created draft of BBP 13.9.0 announcement
** Use two DT parameters GF_DT and HF_DT
+
* Talked to JD about Mw 7 events for SWUS meeting
* Removed src file DT from UCSB codebase
+
** Got 3 Mw scenarios
 +
** Ran ExSIM scenario, results posted on bbpvault
 +
* Received new version of rupture generator from RG
 +
** Created Trac ticket
 +
* Started Mw 5.5 scenarios for KO on HPCC
 +
** Sent results to KO, RT
  
 
== Today: ==
 
== Today: ==
  
* Continue work on removing DT from .src file (trac #146)
+
* Update broadband-all mailing list with new users
** Add DT to each GF package, remove from SRC file
+
* Send BBP 13.9.0 announcement
** Remove src file DT from GP codebase (RG, LF, HF, SR, Match)
+
* Start GP and SDSU Mw 7.0 scenarios
** Look for DT use in other BBP modules (plots, etc.)
+
* BBP meeting with PM
  
 
== Blocked: ==
 
== Blocked: ==
Line 17: Line 22:
  
 
== Followups: ==
 
== Followups: ==
* BBP meeting with PM @ TBD
+
* BBP Iteration planning with PM @ 1:00-3:00pm

Revision as of 17:19, 9 October 2013

Yesterday:

  • Sent proposed list of broadband-all users to PM
  • Created draft of BBP 13.9.0 announcement
  • Talked to JD about Mw 7 events for SWUS meeting
    • Got 3 Mw scenarios
    • Ran ExSIM scenario, results posted on bbpvault
  • Received new version of rupture generator from RG
    • Created Trac ticket
  • Started Mw 5.5 scenarios for KO on HPCC
    • Sent results to KO, RT

Today:

  • Update broadband-all mailing list with new users
  • Send BBP 13.9.0 announcement
  • Start GP and SDSU Mw 7.0 scenarios
  • BBP meeting with PM

Blocked:

  • No

Followups:

  • BBP Iteration planning with PM @ 1:00-3:00pm