Difference between revisions of "Staff Priorities - Phil"
From SCECpedia
Jump to navigationJump to searchLine 4: | Line 4: | ||
== Today: == | == Today: == | ||
− | * | + | * Ask SC to propose BW metrics from paper |
− | |||
− | |||
− | |||
== Blocked: == | == Blocked: == |
Revision as of 06:40, 25 November 2013
Contents
Yesterday:
- BW Call
- Travel plans to AGU
Today:
- Ask SC to propose BW metrics from paper
Blocked:
- No
Followups:
Pending:
- Formalize the simulation plans for NR
- Call with SD and KO on dynamic rupture
- Find images from CMU of circular GTL structures
- Security Discussion with SC
- Backup strategy with group
- Setup license meeting with Stevens USC
- Create Storage Map for SCEC Storage (SC)
- Updated BBP and UCVM required docs to include "known problems" file