Difference between revisions of "Staff Priorities - Phil"

From SCECpedia
Jump to navigationJump to search
Line 1: Line 1:
 
== Yesterday: ==
 
== Yesterday: ==
* NCAR Report to TJ  YC
+
* High-F call 11:30am RT
* Posted SC materials on wiki
+
* YC Call 2pm
* Collected IDC report from SC13
+
* �Submitted NCAR report
* Ergo eval
 
* UCVM Paper review
 
* OLCF follow-up
 
  
 
== Today: ==
 
== Today: ==
* Setup High-F call for Wed
+
* TJ Meeting
* High-F call 11:30am
+
* SC Travel docs
* YC Call 2pm
+
* High-F call 10:30-11am
 
* SC to propose BW metrics from paper
 
* SC to propose BW metrics from paper
 
* Setup INCITE Startup Request Call
 
* Setup INCITE Startup Request Call

Revision as of 17:59, 27 November 2013

Yesterday:

  • High-F call 11:30am RT
  • YC Call 2pm
  • �Submitted NCAR report

Today:

  • TJ Meeting
  • SC Travel docs
  • High-F call 10:30-11am
  • SC to propose BW metrics from paper
  • Setup INCITE Startup Request Call

Blocked:

  • No

Followups:

  • No

Pending:

  • THJ and YC Call
  • NGA-E Plan link to THJ
  • FW ABF into CME codebase
  • Formalize the simulation plans for NR
  • Call with SD and KO on dynamic rupture
  • Find images from CMU of circular GTL structures
  • Security Discussion with SC
  • Backup strategy with group
  • Setup license meeting with Stevens USC
  • Create Storage Map for SCEC Storage (SC)
  • Updated BBP and UCVM required docs to include "known problems" file