Difference between revisions of "Staff Priorities - Phil"

From SCECpedia
Jump to navigationJump to search
Line 11: Line 11:
 
* SC to propose BW metrics from paper
 
* SC to propose BW metrics from paper
 
* Setup INCITE Startup Request Call
 
* Setup INCITE Startup Request Call
 +
* Call with RT on UCVM
  
 
== Blocked: ==
 
== Blocked: ==

Revision as of 18:18, 27 November 2013

Yesterday:

  • High-F call 11:30am RT
  • YC Call 2pm
  • Submitted NCAR report
  • DOE Press Release review

Today:

  • TJ Meeting
  • SC Travel docs
  • High-F call 10:30-11am
  • SC to propose BW metrics from paper
  • Setup INCITE Startup Request Call
  • Call with RT on UCVM

Blocked:

  • No

Followups:

  • No

Pending:

  • THJ and YC Call
  • NGA-E Plan link to THJ
  • FW ABF into CME codebase
  • Formalize the simulation plans for NR
  • Call with SD and KO on dynamic rupture
  • Find images from CMU of circular GTL structures
  • Security Discussion with SC
  • Backup strategy with group
  • Setup license meeting with Stevens USC
  • Create Storage Map for SCEC Storage (SC)
  • Updated BBP and UCVM required docs to include "known problems" file