Difference between revisions of "Staff Priorities - Phil"

From SCECpedia
Jump to navigationJump to search
Line 6: Line 6:
 
* SCEC EarthCube participation
 
* SCEC EarthCube participation
 
* Chair Palace
 
* Chair Palace
*
+
* SSA Abstracts
  
 
== Blocked: ==
 
== Blocked: ==
Line 12: Line 12:
  
 
== Followups: ==  
 
== Followups: ==  
 +
* Director Candidate Practice
 
* UCVM meeting ()
 
* UCVM meeting ()
 
* BBP Meeting ()
 
* BBP Meeting ()

Revision as of 17:39, 6 January 2014

Yesterday:

  • Peace on Earth

Today:

  • DOE 2013 Final Report
  • SCEC EarthCube participation
  • Chair Palace
  • SSA Abstracts

Blocked:

  • No

Followups:

  • Director Candidate Practice
  • UCVM meeting ()
  • BBP Meeting ()
  • CSEP Meeting ()
  • CyberShake Meeting ()
  • UCERF Meeting ()
  • High-F Update

Pending:

  • THJ and YC Call
  • FW ABF into CME codebase
  • Formalize the simulation plans for NR
  • Find images from CMU of circular GTL structures
  • Security Discussion with SC
  • Backup strategy with group
  • Setup license meeting with Stevens USC
  • Create Storage Map for SCEC Storage (SC)
  • Updated BBP and UCVM required docs to include "known problems" file