Difference between revisions of "Staff Priorities - Phil"

From SCECpedia
Jump to navigationJump to search
Line 1: Line 1:
 
== Yesterday: ==
 
== Yesterday: ==
* Holiday
+
* Finalized SCEC EarthCube participation (Not Available)
 +
* Scheduled Chair Palace (Jan 27th)
 +
* Updated UCVM email list (set group posting)
 +
* Update Calendars
 +
* Tom on NR products
  
 
== Today: ==
 
== Today: ==
 
* DOE INCITE 2013 Final Report
 
* DOE INCITE 2013 Final Report
* SCEC EarthCube participation
 
* Visit Chair Palace
 
 
* SSA Abstracts Due Jan 10
 
* SSA Abstracts Due Jan 10
* UCVM email list (set group posting)
+
* SCEC social media feedback
 +
* Follow-up Scott (CyberShake) (10:30am)
 
* BBP Storage review
 
* BBP Storage review
* Update Calendars
 
* Tom on NR products
 
* SCEC social media feedback
 
* Setup Blue Waters Call
 
  
 
== Blocked: ==
 
== Blocked: ==
Line 18: Line 17:
  
 
== Followups: ==  
 
== Followups: ==  
* Setup Blue Waters Call
 
 
* Director Candidate Practice
 
* Director Candidate Practice
 
* UCVM meeting ()
 
* UCVM meeting ()

Revision as of 17:32, 7 January 2014

Yesterday:

  • Finalized SCEC EarthCube participation (Not Available)
  • Scheduled Chair Palace (Jan 27th)
  • Updated UCVM email list (set group posting)
  • Update Calendars
  • Tom on NR products

Today:

  • DOE INCITE 2013 Final Report
  • SSA Abstracts Due Jan 10
  • SCEC social media feedback
  • Follow-up Scott (CyberShake) (10:30am)
  • BBP Storage review

Blocked:

  • No

Followups:

  • Director Candidate Practice
  • UCVM meeting ()
  • BBP Meeting ()
  • CSEP Meeting ()
  • CyberShake Meeting ()
  • UCERF Meeting ()
  • High-F Update ()

Pending:

  • FW ABF into CME codebase
  • Formalize the simulation plans for NR
  • Find images from CMU of circular GTL structures
  • Security Discussion with SC
  • Backup strategy with group
  • Setup license meeting with Stevens USC
  • Create Storage Map for SCEC Storage (SC)
  • Updated BBP and UCVM required docs to include "known problems" file