Difference between revisions of "Staff Priorities - Phil"
From SCECpedia
Jump to navigationJump to search| Line 5: | Line 5: | ||
== Today: == | == Today: == | ||
| − | |||
* DOE INCITE 2013 Final Report | * DOE INCITE 2013 Final Report | ||
* SCEC social media feedback | * SCEC social media feedback | ||
* 1D model for CyberShake | * 1D model for CyberShake | ||
* Review CyberShake model | * Review CyberShake model | ||
| + | * Check on BBP Storage Status | ||
| + | |||
== Blocked: == | == Blocked: == | ||
Revision as of 17:34, 21 January 2014
Contents
Yesterday:
- Submitted 15 SCEC proposal reviews
- Sent in updated CUG BW Abstract
- Sent in EC Project proposal
Today:
- DOE INCITE 2013 Final Report
- SCEC social media feedback
- 1D model for CyberShake
- Review CyberShake model
- Check on BBP Storage Status
Blocked:
- No
Followups:
- No
Pending:
- FW ABF into CME codebase
- Formalize the simulation plans for NR
- Find images from CMU of circular GTL structures
- Security Discussion with SC
- Backup strategy with group
- Setup license meeting with Stevens USC
- Create Storage Map for SCEC Storage (SC)
- Updated BBP and UCVM required docs to include "known problems" file