Difference between revisions of "Staff Priorities - Phil"
From SCECpedia
Jump to navigationJump to searchLine 9: | Line 9: | ||
* Web Meeting (1pm) | * Web Meeting (1pm) | ||
* BBP Call (2pm) | * BBP Call (2pm) | ||
+ | * Work with DG on 1D model for CyberShake | ||
* DOE INCITE 2013 Final Report | * DOE INCITE 2013 Final Report | ||
* SCEC social media feedback | * SCEC social media feedback | ||
− | |||
* Review CyberShake model | * Review CyberShake model | ||
* Check on BBP Storage Status | * Check on BBP Storage Status | ||
− | |||
== Blocked: == | == Blocked: == |
Revision as of 17:41, 21 January 2014
Contents
Yesterday:
- Submitted 15 SCEC proposal reviews
- Sent in updated CUG BW Abstract
- Sent in EC Project proposal
Today:
- High-F Call (11am)
- CyberShake Call (11:30am)
- Web Meeting (1pm)
- BBP Call (2pm)
- Work with DG on 1D model for CyberShake
- DOE INCITE 2013 Final Report
- SCEC social media feedback
- Review CyberShake model
- Check on BBP Storage Status
Blocked:
- No
Followups:
- No
Pending:
- FW ABF into CME codebase
- Formalize the simulation plans for NR
- Find images from CMU of circular GTL structures
- Security Discussion with SC
- Backup strategy with group
- Setup license meeting with Stevens USC
- Create Storage Map for SCEC Storage (SC)
- Updated BBP and UCVM required docs to include "known problems" file