Difference between revisions of "Staff Priorities - Phil"
From SCECpedia
Jump to navigationJump to searchLine 12: | Line 12: | ||
* Send out Geo/SI2 Call Announce | * Send out Geo/SI2 Call Announce | ||
* TTI one paper | * TTI one paper | ||
− | + | * | |
== Blocked: == | == Blocked: == | ||
* No | * No | ||
Line 18: | Line 18: | ||
== Followups: == | == Followups: == | ||
* DG conversion from 1D file to UCVM 1D config | * DG conversion from 1D file to UCVM 1D config | ||
+ | * CS parallelism discussion with SC | ||
== Pending: == | == Pending: == |
Revision as of 17:59, 30 January 2014
Contents
Yesterday:
- Contact SRL editor
- Contact ED about EC project
- Work with DG on 1D model for CyberShake
- Check with KO RG on Moho
- Check on BBP Storage Status
- Talk with EL
Today:
- PC feedback
- DOE INCITE 2013 Final Report
- Send out Geo/SI2 Call Announce
- TTI one paper
Blocked:
- No
Followups:
- DG conversion from 1D file to UCVM 1D config
- CS parallelism discussion with SC
Pending:
- Confirm SI2 meeting
- FW ABF into CME codebase
- Formalize the simulation plans for NR
- Find images from CMU of circular GTL structures
- Security Discussion with SC
- Backup strategy with group
- Setup license meeting with Stevens USC
- Create Storage Map for SCEC Storage (SC)
- Updated BBP and UCVM required docs to include "known problems" file