Difference between revisions of "Staff Priorities - Phil"
From SCECpedia
Jump to navigationJump to searchLine 1: | Line 1: | ||
== Yesterday: == | == Yesterday: == | ||
− | * | + | * PC feedback |
− | + | * Send out Geo Call Announce | |
− | * | + | * EC Discussion with TJ/ED |
− | + | * Nvidia meeting at 1:30pm | |
− | * | ||
− | * | ||
− | |||
− | |||
− | |||
− | |||
− | |||
== Today: == | == Today: == | ||
− | * | + | * Schedule CS Science Review |
− | + | * EC Draft Update | |
− | |||
− | |||
− | * Update | ||
* TTI one pager | * TTI one pager | ||
+ | * INCITE 2013 Final Report Draft | ||
+ | * Send out Geo Call Announce | ||
== Blocked: == | == Blocked: == | ||
Line 24: | Line 16: | ||
== Followups: == | == Followups: == | ||
− | * | + | * BBP Med-term discussion |
+ | * Blue Waters Scheduled downtime | ||
== Pending: == | == Pending: == |
Revision as of 18:10, 3 February 2014
Contents
Yesterday:
- PC feedback
- Send out Geo Call Announce
- EC Discussion with TJ/ED
- Nvidia meeting at 1:30pm
Today:
- Schedule CS Science Review
- EC Draft Update
- TTI one pager
- INCITE 2013 Final Report Draft
- Send out Geo Call Announce
Blocked:
- No
Followups:
- BBP Med-term discussion
- Blue Waters Scheduled downtime
Pending:
- Confirm SI2 meeting
- CS parallelism discussion with SC
- FW ABF into CME codebase
- Formalize the simulation plans for NR
- Find images from CMU of circular GTL structures
- Security Discussion with SC
- Backup strategy with group
- Setup license meeting with Stevens USC
- Create Storage Map for SCEC Storage (SC)
- Updated BBP and UCVM required docs to include "known problems" file