Difference between revisions of "Staff Priorities - Scott"

From SCECpedia
Jump to navigationJump to search
Line 1: Line 1:
 
== Yesterday ==
 
== Yesterday ==
*Monitored Study 14.2, GPU with CVM-S4.26 complete
+
*Kevin generated hazard maps for GPU results, posted on wiki, emailed to group
*Started working with genslip-v3.3.1
+
*Checked genslip-v3.3.1 against Rob's results, they match
*Adjusted color maps for hazard curves
+
*BW allocation planning meeting
 +
*Check-in with Phil
  
 
== Today ==
 
== Today ==
*Ask Kevin to generate hazard maps for GPU, CVM-S4.26 once color plot is decided
+
*Continue monitoring Study 14.2
*Post hazard maps on wiki and email out
+
*Continue integrating genslip v3.3.1 into rupture generator API and test
*Continue work with genslip-v3.3.1 (check against Rob's results, integrate with API)
+
*Try to delete Intrepid data
  
 
== Blocked ==
 
== Blocked ==
Line 13: Line 14:
  
 
== Follow-ups ==
 
== Follow-ups ==
*BW allocation planning
+
*No
*Phil check-in?
 
  
 
== Areas of Responsibilities ==
 
== Areas of Responsibilities ==

Revision as of 18:11, 28 February 2014

Yesterday

  • Kevin generated hazard maps for GPU results, posted on wiki, emailed to group
  • Checked genslip-v3.3.1 against Rob's results, they match
  • BW allocation planning meeting
  • Check-in with Phil

Today

  • Continue monitoring Study 14.2
  • Continue integrating genslip v3.3.1 into rupture generator API and test
  • Try to delete Intrepid data

Blocked

  • No

Follow-ups

  • No

Areas of Responsibilities

  • CyberShake
  • Broadband CyberShake
  • Code migration