Difference between revisions of "Staff Priorities - Phil"
From SCECpedia
Jump to navigationJump to searchLine 1: | Line 1: | ||
== Yesterday: == | == Yesterday: == | ||
− | * | + | * CSEP Call |
− | * PRAC | + | * PRAC Call |
+ | * PRAC Draft | ||
== Today: == | == Today: == | ||
− | * PRAC Proposal Call | + | * Web call 1030 |
− | * | + | * PRAC Proposal Call 11pm |
+ | * CyberShake 1130am | ||
== Blocked: == | == Blocked: == | ||
Line 11: | Line 13: | ||
== Followups: == | == Followups: == | ||
− | * | + | * Scott now |
− | |||
== Pending: == | == Pending: == |
Revision as of 18:31, 4 March 2014
Contents
Yesterday:
- CSEP Call
- PRAC Call
- PRAC Draft
Today:
- Web call 1030
- PRAC Proposal Call 11pm
- CyberShake 1130am
Blocked:
- No
Followups:
- Scott now
Pending:
- FW ABF into CME codebase
- Find images from CMU of circular GTL structures
- Security Discussion with SC
- Backup strategy with group
- Setup license meeting with Stevens USC
- Create Storage Map for SCEC Storage (SC)
- Updated BBP and UCVM required docs to include "known problems" file