Difference between revisions of "Staff Priorities - Scott"

From SCECpedia
Jump to navigationJump to search
Line 1: Line 1:
 
== Yesterday ==
 
== Yesterday ==
*Gathered more metrics; trying to understand the difference between average nodes and application parallel speedup
+
*Calculated and plotted hypocenters for large San Andreas rupture, emailed out
*Tested Rob's modifications to rupture generator - reproducing reference results
+
*Got text together for Tom
*Calculated space needed for purge exemption - only about 100 GB, but may ask for 500 GB for testing space
+
*Reviewed Summer School applications
*CyberShake calls
 
  
 
== Today ==
 
== Today ==
*Finish gathering Study 14.2 metrics
+
*Email Matt to ask about unpurged request
*Test Rob's modifications in API
+
*Look over SeedMe to respond to Amit
*Respond to Amit about SeedMe
 
*Reply to Omar about metrics
 
 
*Start drafting abstract for extreme scaling
 
*Start drafting abstract for extreme scaling
*File Titan purge exemption
+
*Modify DAX generator to aggregate files at the source level and test
 +
*Start preliminary work on merging extraction and synthesis stages
  
 
== Blocked ==
 
== Blocked ==
Line 17: Line 15:
  
 
== Follow-ups ==
 
== Follow-ups ==
*No
+
*Summer School call
 +
*High-F
 +
*CyberShake calls
  
 
== Areas of Responsibilities ==
 
== Areas of Responsibilities ==

Revision as of 17:08, 1 April 2014

Yesterday

  • Calculated and plotted hypocenters for large San Andreas rupture, emailed out
  • Got text together for Tom
  • Reviewed Summer School applications

Today

  • Email Matt to ask about unpurged request
  • Look over SeedMe to respond to Amit
  • Start drafting abstract for extreme scaling
  • Modify DAX generator to aggregate files at the source level and test
  • Start preliminary work on merging extraction and synthesis stages

Blocked

  • No

Follow-ups

  • Summer School call
  • High-F
  • CyberShake calls

Areas of Responsibilities

  • CyberShake
  • Broadband CyberShake
  • Code migration