Difference between revisions of "Staff Priorities - Phil"

From SCECpedia
Jump to navigationJump to search
Line 1: Line 1:
 
== Yesterday: ==
 
== Yesterday: ==
* Web call 10:30
+
* Get updated SA binaries for SCEC
* High-F 11am
+
* Missed CSEP Call (12noon)
* CyberShake 11:30am
+
* SCEC current HPCC Storage Map
* Admin 1pm
+
* Confirmed XAB travel plan [4/16 - 4/21]
* Confirm BBP sfi w/ SRL Editor
+
* Meeting on GTL and CVM-S5
  
 
== Today: ==
 
== Today: ==
* CSEP Call (12noon)
+
* Geo Call (11am)
* Refine SCEC Storage Plan
+
* BW Call (1pm)
* Respond Mira access
+
* Web Interview (4pm)
* Respond Blue Waters Symposium
+
* Local SCEC Storage map
* Confirm XAB travel plans
 
 
* Send SA User Display to TH
 
* Send SA User Display to TH
 
* BBP paper
 
* BBP paper
* BW Paper ESW
+
* Test seism email list
* Meeting with PC on GTL (2pm)
+
* Fix issues with Geo email list
 +
* Check in nga
  
 
== Blocked: ==
 
== Blocked: ==
Line 24: Line 24:
  
 
== Pending: ==
 
== Pending: ==
* Edit email list
 
* Tech Paper Development
 
**XTREME scaling
 
**XSEDE Atlanta
 
**BBP
 
 
* Setup license meeting with Stevens USC
 
* Setup license meeting with Stevens USC
 
* FW ABF into CME codebase
 
* FW ABF into CME codebase

Revision as of 16:39, 3 April 2014

Yesterday:

  • Get updated SA binaries for SCEC
  • Missed CSEP Call (12noon)
  • SCEC current HPCC Storage Map
  • Confirmed XAB travel plan [4/16 - 4/21]
  • Meeting on GTL and CVM-S5

Today:

  • Geo Call (11am)
  • BW Call (1pm)
  • Web Interview (4pm)
  • Local SCEC Storage map
  • Send SA User Display to TH
  • BBP paper
  • Test seism email list
  • Fix issues with Geo email list
  • Check in nga

Blocked:

  • No

Followups:

  • No

Pending:

  • Setup license meeting with Stevens USC
  • FW ABF into CME codebase
  • Find images from CMU of circular GTL structures
  • Backup strategy with group
  • Updated BBP and UCVM required docs to include "known problems" file