Difference between revisions of "Staff Priorities - Scott"

From SCECpedia
Jump to navigationJump to search
Line 1: Line 1:
 
== Yesterday ==
 
== Yesterday ==
*Worked on TEST hazard curve with new RV generator as requested by Rob
+
*Produced TEST hazard curve with new RV generator, emailed to group
**Modified TC
+
*Produced SBSM, WNGC, PAS hazard curves with new RV generator
**Modified DAX generator to support new RupGen version
+
*Emailed Phil XSEDE SU estimate for CyberShake work
**Upgraded Pegasus
+
*Reviewed storage spreadsheet
**Queued curve; failed on insert
 
*HighF call
 
*CyberShake call
 
  
 
== Today ==
 
== Today ==
*Continue work on TEST hazard curve
+
*Produce USC hazard curve
*Provide XSEDE SU estimate for CyberShake work
+
*Calculate comparison curves, send out to group
*Review storage spreadsheet
+
*Work on 200m rupture point spacing with new RVs
 +
**Calculate and insert into DB
 +
**Locate 200m SGTs
 +
**Queue curve
  
 
== Blocked ==
 
== Blocked ==
Line 17: Line 17:
  
 
== Follow-ups ==
 
== Follow-ups ==
*No
+
*SEISM call
  
  

Revision as of 17:09, 10 April 2014

Yesterday

  • Produced TEST hazard curve with new RV generator, emailed to group
  • Produced SBSM, WNGC, PAS hazard curves with new RV generator
  • Emailed Phil XSEDE SU estimate for CyberShake work
  • Reviewed storage spreadsheet

Today

  • Produce USC hazard curve
  • Calculate comparison curves, send out to group
  • Work on 200m rupture point spacing with new RVs
    • Calculate and insert into DB
    • Locate 200m SGTs
    • Queue curve

Blocked

  • No

Follow-ups

  • SEISM call


  • Try out SeedMe so I can respond to Amit
  • Start drafting abstract for extreme scaling
  • Revise DAX generator to group output by source


Areas of Responsibilities

  • CyberShake
  • Broadband CyberShake
  • Code migration