== Yesterday ==
*Produced TEST hazard curve with new RV generator, emailed to group
+
*Produced USC hazard curve
*Produced SBSM, WNGC, PAS hazard curves with new RV generator
+
*Calculated comparison curves, emailed out to group
*Emailed Phil XSEDE SU estimate for CyberShake work
+
*Worked on 200m rupture point spacing with new RVs
*Reviewed storage spreadsheet
+
**Calculated and insert into DB
 +
**200m SGTs were on scratch, have been purged
 +
**Queued curve, DAX issues, emailed Karan
  
 
== Today ==
 
== Today ==
*Produce USC hazard curve
+
*Fix DAX issues, produce 200m TEST curve
*Calculate comparison curves, send out to group
+
*Revise DAX generator to group output by source
*Work on 200m rupture point spacing with new RVs
+
*Preliminary work on reducing temporary data
**Calculate and insert into DB
 
**Locate 200m SGTs
 
**Queue curve
 
  
 
== Blocked ==
 
== Blocked ==
Line 17: Line 16:
  
 
== Follow-ups ==
 
== Follow-ups ==
*SEISM call
+
*No
  
  
 
*Try out SeedMe so I can respond to Amit
 
*Try out SeedMe so I can respond to Amit
 
*Start drafting abstract for extreme scaling
 
*Start drafting abstract for extreme scaling
*Revise DAX generator to group output by source
 
  
  

Revision as of 17:31, 11 April 2014

Yesterday

  • Produced USC hazard curve
  • Calculated comparison curves, emailed out to group
  • Worked on 200m rupture point spacing with new RVs
    • Calculated and insert into DB
    • 200m SGTs were on scratch, have been purged
    • Queued curve, DAX issues, emailed Karan

Today

  • Fix DAX issues, produce 200m TEST curve
  • Revise DAX generator to group output by source
  • Preliminary work on reducing temporary data

Blocked

  • No

Follow-ups

  • No


  • Try out SeedMe so I can respond to Amit
  • Start drafting abstract for extreme scaling


Areas of Responsibilities

  • CyberShake
  • Broadband CyberShake
  • Code migration