Difference between revisions of "Staff Priorities - Scott"

From SCECpedia
Jump to navigationJump to search
Line 1: Line 1:
 
== Yesterday ==
 
== Yesterday ==
*Emailed Tom requested map of CyberShake sites
+
*Hunted down seg fault in synth code for 200m rupture surfaces
*Worked on draft abstract for extreme scaling workshop
+
*Queued 200m curve, new seg faults appeared
*Resumed 200m run - seg fault
+
*Wrote version of rupture generator which uses FFTW for the FFTs
  
 
== Today ==
 
== Today ==
*Finish first draft of abstract for extreme scaling workshop
+
*Try out Lync with Blue Jeans
*Start implementing plan to reduce temp data
+
*Debug new seg faults
 +
*Test FFTW version of rupture generator
 
*Get timing data with rupture variation generator to Yifeng
 
*Get timing data with rupture variation generator to Yifeng
  

Revision as of 17:00, 21 April 2014

Yesterday

  • Hunted down seg fault in synth code for 200m rupture surfaces
  • Queued 200m curve, new seg faults appeared
  • Wrote version of rupture generator which uses FFTW for the FFTs

Today

  • Try out Lync with Blue Jeans
  • Debug new seg faults
  • Test FFTW version of rupture generator
  • Get timing data with rupture variation generator to Yifeng

Blocked

  • No

Follow-ups

  • No


  • Try out SeedMe so I can respond to Amit


Areas of Responsibilities

  • CyberShake
  • Broadband CyberShake
  • Code migration