Difference between revisions of "Staff Priorities - Phil"

From SCECpedia
Jump to navigationJump to search
Line 5: Line 5:
 
* HPCC Meeting (12pm)
 
* HPCC Meeting (12pm)
 
* BBP Code Review (1pm)
 
* BBP Code Review (1pm)
* Prepare extended BW Abstract
+
* Prepare extended BW Abstract (Due 15 April)
* Setup TJ/JT coordination call
 
 
* Develop BBP paper outline
 
* Develop BBP paper outline
 +
* Heartbl response
  
 
== Blocked: ==
 
== Blocked: ==
Line 16: Line 16:
  
 
== Pending: ==
 
== Pending: ==
 +
* Setup TJ/JT coordination call
 +
* XS Abstract
 
* Post laptop storage table on wiki
 
* Post laptop storage table on wiki
 
* Test seism email list
 
* Test seism email list

Revision as of 16:58, 23 April 2014

Yesterday:

  • XSEDE Advisory Board Meeting

Today:

  • HPCC Meeting (12pm)
  • BBP Code Review (1pm)
  • Prepare extended BW Abstract (Due 15 April)
  • Develop BBP paper outline
  • Heartbl response

Blocked:

  • No

Followups:

  • No

Pending:

  • Setup TJ/JT coordination call
  • XS Abstract
  • Post laptop storage table on wiki
  • Test seism email list
  • Fix issues with Geo email list
  • GMPE New relations integrated into BBP
  • FW ABF into CME codebase
  • Setup license meeting with Stevens USC
  • Updated BBP and UCVM required docs to include "known problems" file