Difference between revisions of "Staff Priorities - Phil"

From SCECpedia
Jump to navigationJump to search
Line 1: Line 1:
 
== Yesterday: ==
 
== Yesterday: ==
* THJ Meeting
+
* THJ Call
* BB Paper authors and outline
+
* USR Paper review to JS
* SEISM Call
+
* BBP Paper work
* BBP Call w/ DD CG
+
* SCEC Status with TH
* ML and JY
+
* DOE email response
* NCSA Descriptions
 
  
 
== Today: ==
 
== Today: ==
* BBP proposal outline to TA
 
* BBP Call 2pm
 
 
* BBP Paper
 
* BBP Paper
 +
* Schedule Proposal Call
 +
* Schedule RG call on NCEE meeting
 +
* TJ and YC prospectus review
  
 
== Blocked: ==
 
== Blocked: ==
Line 25: Line 25:
 
* GMPE New relations integrated into BBP
 
* GMPE New relations integrated into BBP
 
* FW ABF into CME codebase
 
* FW ABF into CME codebase
* Setup license meeting with Stevens USC
 
 
* Updated BBP and UCVM required docs to include "known problems" file
 
* Updated BBP and UCVM required docs to include "known problems" file

Revision as of 16:54, 11 June 2014

Yesterday:

  • THJ Call
  • USR Paper review to JS
  • BBP Paper work
  • SCEC Status with TH
  • DOE email response

Today:

  • BBP Paper
  • Schedule Proposal Call
  • Schedule RG call on NCEE meeting
  • TJ and YC prospectus review

Blocked:

  • No

Followups:

  • No

Pending:

  • SResponse
  • Post laptop storage table on wiki
  • Test seism email list
  • Fix issues with Geo email list
  • GMPE New relations integrated into BBP
  • FW ABF into CME codebase
  • Updated BBP and UCVM required docs to include "known problems" file