Difference between revisions of "Staff Priorities - Fabio"

From SCECpedia
Jump to navigationJump to search
Line 1: Line 1:
 
== Yesterday ==
 
== Yesterday ==
  
* Removed all hardcoded models, labels, periods, etc
+
* UCSB code update
* Fixed several issues with new GMPE code
+
** syn1D updated
** Got bug fix from FW
+
* Part-C script
** Plotting code scales to how many GMPE models are available
+
** Python code update
* Tested new BBP workflow
+
** Matlab code update
** Part-A: Validation runs
+
* ERI-SS
** Part-B: GMPE verification runs
+
** BBP NR with UCSB code
* Set up shared folder on Virtual Box
+
** Windows laptop back from JY
 +
** SCEC VDO working on Windows 7 laptop
 +
** Confirmed MS Office installed on laptop
 +
** Tried SCEC VDO on Mac OS X laptops
  
 
== Today ==
 
== Today ==
  
* Check with KM, JY status of SCEC VDO setup
+
* ERI Workshop planning with PM, KM, DG
* Part-C: GMPE plots for BBP runs
+
* Run Part-C script for CG's simulations
* Write test cases for GMPE code
+
* UCSB code updates, source
* Update cluster scripts
+
* Run validation runs for UCSB method
  
 
== Blocked: ==
 
== Blocked: ==
Line 21: Line 24:
  
 
== Followups: ==
 
== Followups: ==
* High-F Call at 11am
+
* Workshop Call at 11am
* BBP schedule Call at 2:30pm
 

Revision as of 17:14, 28 August 2014

Yesterday

  • UCSB code update
    • syn1D updated
  • Part-C script
    • Python code update
    • Matlab code update
  • ERI-SS
    • BBP NR with UCSB code
    • Windows laptop back from JY
    • SCEC VDO working on Windows 7 laptop
    • Confirmed MS Office installed on laptop
    • Tried SCEC VDO on Mac OS X laptops

Today

  • ERI Workshop planning with PM, KM, DG
  • Run Part-C script for CG's simulations
  • UCSB code updates, source
  • Run validation runs for UCSB method

Blocked:

  • No

Followups:

  • Workshop Call at 11am