Difference between revisions of "Staff Priorities - Fabio"

From SCECpedia
Jump to navigationJump to search
Line 3: Line 3:
 
* UCSB code update
 
* UCSB code update
 
** syn1D updated
 
** syn1D updated
* Part-C script
+
** KinModel updated
** Python code update
+
** Source generates SRF file
** Matlab code update
+
** syn1D fails on Mineral run
* ERI-SS
+
** Sent bug report to JC
** BBP NR with UCSB code
+
* PG&E meeting
** Windows laptop back from JY
 
** SCEC VDO working on Windows 7 laptop
 
** Confirmed MS Office installed on laptop
 
** Tried SCEC VDO on Mac OS X laptops
 
  
 
== Today ==
 
== Today ==
  
* ERI Workshop planning with PM, KM, DG
+
* Update cluster scripts to work with new GMPEs
* Run Part-C script for CG's simulations
+
** add command-line option for users to select gmpe group to use
* UCSB code updates, source
+
* Respond to BBP bug report from DWR
* Run validation runs for UCSB method
+
* Waiting for JC's bug fix
 +
* Install new CME image on Windows laptop
 +
** Test BBP performance on windows
  
 
== Blocked: ==
 
== Blocked: ==
Line 24: Line 22:
  
 
== Followups: ==
 
== Followups: ==
* Workshop Call at 11am
+
* High-F call at 11am

Revision as of 17:25, 2 September 2014

Yesterday

  • UCSB code update
    • syn1D updated
    • KinModel updated
    • Source generates SRF file
    • syn1D fails on Mineral run
    • Sent bug report to JC
  • PG&E meeting

Today

  • Update cluster scripts to work with new GMPEs
    • add command-line option for users to select gmpe group to use
  • Respond to BBP bug report from DWR
  • Waiting for JC's bug fix
  • Install new CME image on Windows laptop
    • Test BBP performance on windows

Blocked:

  • No

Followups:

  • High-F call at 11am