Difference between revisions of "Staff Priorities - Masha"

From SCECpedia
Jump to navigationJump to search
Line 3: Line 3:
 
=== Yesterday ===
 
=== Yesterday ===
 
* CSEP:
 
* CSEP:
** Trac ticket #340: Do not apply (31-days) lag when downloading raw catalog data
+
** John moved canterbury image to arc.usc.edu, restored csep-cert image
** Stopped processing on canterbury, asked John to move image to another server, restore csep-cert for release candidate testing
+
** Moved missing daily and 30-min forecasts from csep-op to csep-cert
* TD:
+
** Re-ran acceptance tests for Darfield models on new server, restored batch processing on canterbury image to generate daily forecasts
** Asked John to fix routing problems, daily processing succeeded
+
** csep-op: high disk usage by daily forecasts, should enable GZIP compression
** Tom H. and Rowena reported that PBO data is available as different solution, need to update the testing center and models to use it
 
  
 
=== Today ===
 
=== Today ===
 
* CSEP:
 
* CSEP:
** Restore csep-cert processing
+
** csep-cert:
** V14.10 release candidate
+
*** Investigate failures from nightly processing
 +
*** CruiseControl build failed
 +
*** Enable GZIP compression for daily forecasts
 +
** V14.10 release candidate, to be installed with John is back
 
** XML schema for QF external forecast
 
** XML schema for QF external forecast
 
** Post meeting minutes once Max emails it to me
 
** Post meeting minutes once Max emails it to me
 +
** Bring NZ realtime data to canterbury image
  
 
'''Blocked''': None
 
'''Blocked''': None

Revision as of 18:37, 23 September 2014

Current Activities

Yesterday

  • CSEP:
    • John moved canterbury image to arc.usc.edu, restored csep-cert image
    • Moved missing daily and 30-min forecasts from csep-op to csep-cert
    • Re-ran acceptance tests for Darfield models on new server, restored batch processing on canterbury image to generate daily forecasts
    • csep-op: high disk usage by daily forecasts, should enable GZIP compression

Today

  • CSEP:
    • csep-cert:
      • Investigate failures from nightly processing
      • CruiseControl build failed
      • Enable GZIP compression for daily forecasts
    • V14.10 release candidate, to be installed with John is back
    • XML schema for QF external forecast
    • Post meeting minutes once Max emails it to me
    • Bring NZ realtime data to canterbury image

Blocked: None

Followups: None

TODO

  • TD: switch testing center to new solution

CSEP

EEW

Responsiblities