Difference between revisions of "Staff Priorities - Scott"
From SCECpedia
Jump to navigationJump to searchLine 9: | Line 9: | ||
*Compare Titan workflow results to reference solution | *Compare Titan workflow results to reference solution | ||
*Calculate probabilistic results for all 14 sites when 2008 and 2014 scaling factors are added by Kevin | *Calculate probabilistic results for all 14 sites when 2008 and 2014 scaling factors are added by Kevin | ||
− | *Calculate deterministic results for LADT along with | + | *Calculate deterministic results for LADT (along with NGA deterministic?) |
== Blocked == | == Blocked == | ||
Line 15: | Line 15: | ||
== Follow-ups == | == Follow-ups == | ||
− | *Phil after | + | *Phil after check-in |
== Areas of Responsibilities == | == Areas of Responsibilities == |
Revision as of 17:20, 8 October 2014
Yesterday
- Developed script to calculate deterministic MCER results, did spot comparison to check
- Sent Kevin list of sites and locations
- Monitored 1 Hz post-processing, completed
Today
- Determine cost of 1 Hz run
- Send out 1 Hz results
- Compare Titan workflow results to reference solution
- Calculate probabilistic results for all 14 sites when 2008 and 2014 scaling factors are added by Kevin
- Calculate deterministic results for LADT (along with NGA deterministic?)
Blocked
- No
Follow-ups
- Phil after check-in
Areas of Responsibilities
- CyberShake
- Broadband CyberShake
- Code migration