Difference between revisions of "Staff Priorities - Scott"
From SCECpedia
Jump to navigationJump to searchLine 1: | Line 1: | ||
== Yesterday == | == Yesterday == | ||
− | * | + | *Modified Titan pilots to abort if not enough walltime remaining |
− | * | + | *Modified Titan workflow jobs to only match if enough walltime left |
− | * | + | *Full-scale 0.5Hz workflow with RotD test on Blue Waters verified (few small issues with workflow) |
− | * | + | *Bug in random vs uniform hypocenter test, fixed, resubmitted |
+ | *Monitor Titan 1 Hz SGTs for PAS, SBSM | ||
+ | *Generated results from 100m mesh at 0.5 Hz, seismograms suggest a scaling issue | ||
+ | *Found hard-coded values in SGT header generation, emailed Rob | ||
== Today == | == Today == | ||
− | |||
*Generate estimate of single pilot job size for Titan workflow | *Generate estimate of single pilot job size for Titan workflow | ||
− | *Monitor | + | *Monitor uniform vs random hypocenter test |
− | |||
− | |||
*Start on presentation for HPCC booth | *Start on presentation for HPCC booth | ||
+ | *Set up meeting time at SC14 with NCSA staff | ||
+ | *Email Matt Norman to see if he'll be at SC14 | ||
+ | *Set up meeting at SC14 with ISI group | ||
+ | *Get feedback from Rob and Kim about SGT header hard-coded values | ||
== Blocked == | == Blocked == | ||
Line 17: | Line 21: | ||
== Follow-ups == | == Follow-ups == | ||
+ | *HighF | ||
+ | *CyberShake | ||
*Shakeout Discussion | *Shakeout Discussion | ||
Revision as of 18:01, 11 November 2014
Yesterday
- Modified Titan pilots to abort if not enough walltime remaining
- Modified Titan workflow jobs to only match if enough walltime left
- Full-scale 0.5Hz workflow with RotD test on Blue Waters verified (few small issues with workflow)
- Bug in random vs uniform hypocenter test, fixed, resubmitted
- Monitor Titan 1 Hz SGTs for PAS, SBSM
- Generated results from 100m mesh at 0.5 Hz, seismograms suggest a scaling issue
- Found hard-coded values in SGT header generation, emailed Rob
Today
- Generate estimate of single pilot job size for Titan workflow
- Monitor uniform vs random hypocenter test
- Start on presentation for HPCC booth
- Set up meeting time at SC14 with NCSA staff
- Email Matt Norman to see if he'll be at SC14
- Set up meeting at SC14 with ISI group
- Get feedback from Rob and Kim about SGT header hard-coded values
Blocked
- No
Follow-ups
- HighF
- CyberShake
- Shakeout Discussion
Areas of Responsibilities
- CyberShake
- Broadband CyberShake
- Code migration