Difference between revisions of "Staff Priorities - Scott"

From SCECpedia
Jump to navigationJump to search
Line 1: Line 1:
 
== Yesterday ==
 
== Yesterday ==
*Summer school call
+
*Resumed PAS 1 Hz run on Blue Waters when system comes back; issue with jobs failing which I think is related to BW upgrade
*Forwarded Rob's responses to Norm
+
*Resumed WNGC workflow on Titan
*Continued developing DirectSynth (~45%)
+
*Prepare SBSM 1 Hz post-processing on Titan
*Took another pass at CUG abstract, got feedback from Phil
+
*Continued work on DirectSynth (~80%)
*Got login on Titan
 
*Emailed Val to check on status of Titan purge exemptions
 
  
 
== Today ==
 
== Today ==
*Integrate Phil's changes into CUG abstract
+
*Summer School mentor call
*Resume PAS 1 Hz run on Blue Waters when system comes back
+
*Recompile libmemcached on Blue Waters
*Prepare SBSM 1 Hz post-processing
+
*Recompile CyberShake codes on Blue Waters
 +
*Monitor Titan run
 
*Continue work on DirectSynth
 
*Continue work on DirectSynth
  
 
== Blocked ==
 
== Blocked ==
*Blue Waters downtime extended
+
*No
  
 
== Follow-ups ==
 
== Follow-ups ==
*ER-Rest call
+
*Blue Waters call
  
 
== Areas of Responsibilities ==
 
== Areas of Responsibilities ==

Revision as of 18:04, 20 January 2015

Yesterday

  • Resumed PAS 1 Hz run on Blue Waters when system comes back; issue with jobs failing which I think is related to BW upgrade
  • Resumed WNGC workflow on Titan
  • Prepare SBSM 1 Hz post-processing on Titan
  • Continued work on DirectSynth (~80%)

Today

  • Summer School mentor call
  • Recompile libmemcached on Blue Waters
  • Recompile CyberShake codes on Blue Waters
  • Monitor Titan run
  • Continue work on DirectSynth

Blocked

  • No

Follow-ups

  • Blue Waters call

Areas of Responsibilities

  • CyberShake
  • Broadband CyberShake
  • Code migration