Difference between revisions of "Staff Priorities - Fabio"
From SCECpedia
Jump to navigationJump to searchLine 1: | Line 1: | ||
== Yesterday == | == Yesterday == | ||
− | * | + | * Finalized BBP directory structure updates |
− | * | + | * Got final OK from JC for the UCSB code and parameters |
− | * | + | * Testing pre-RC1 on HPCC |
− | + | * Got all Unit/Acceptance tests to pass | |
− | + | * Coordinating with JY about epicenter drives | |
− | * | + | * Worked on BBP examples for First Simulations |
− | * | ||
− | |||
== Today == | == Today == | ||
− | * | + | * Finish BBP testing on HPCC |
− | * | + | * Update Release Notes |
− | * | + | * Update Mac OS X Installation Guide |
− | * | + | * Work on BBP User's Guide |
== Blocked: == | == Blocked: == | ||
Line 21: | Line 19: | ||
== Followups: == | == Followups: == | ||
− | * | + | * No |
Revision as of 19:26, 9 March 2015
Contents
Yesterday
- Finalized BBP directory structure updates
- Got final OK from JC for the UCSB code and parameters
- Testing pre-RC1 on HPCC
- Got all Unit/Acceptance tests to pass
- Coordinating with JY about epicenter drives
- Worked on BBP examples for First Simulations
Today
- Finish BBP testing on HPCC
- Update Release Notes
- Update Mac OS X Installation Guide
- Work on BBP User's Guide
Blocked:
- No
Followups:
- No