Difference between revisions of "Staff Priorities - Scott"

From SCECpedia
Jump to navigationJump to search
Line 1: Line 1:
 
== Yesterday ==
 
== Yesterday ==
*Worked on verifying results calculated using DirectSynth with restart - needed to regenerate reference solution, queued it up
+
*Updated Study 15.3 wiki entry, including data and compute estimates
*2 Hz source run completed, constructed and emailed links to plots
+
*Monitored RotD insertions, error on one of the sites
*Monitored RotD insertions
+
*Debugged cleanup issues
*Tested and verified parallel AWP reformat code
+
*Found issue with UCVM install on Titan, rebuilt UCVM
*Queued up WNGC 1 Hz run with SGTs on Titan, encountered cleanup problem
+
*Verified parallel version of reformat AWP code is faster (~3x) and correct
  
 
== Today ==
 
== Today ==
*Update Study 15.3 wiki entry
+
*Retry site with RotD insertion error
*Monitor RotD insertions
+
*Finish restart verification
*Debug cleanup problem with Karan's help
+
*Test UCVM install when Titan returns
*Finish restart verification when Blue Waters returns
 
*Test Titan/Blue Waters handoff
 
  
 
== Blocked ==
 
== Blocked ==
*Blue Waters down for maintenance today
+
*Titan down for maintenance today
  
 
== Follow-ups ==
 
== Follow-ups ==
*No
+
*HighF call
  
 
== Areas of Responsibilities ==
 
== Areas of Responsibilities ==

Revision as of 17:08, 10 March 2015

Yesterday

  • Updated Study 15.3 wiki entry, including data and compute estimates
  • Monitored RotD insertions, error on one of the sites
  • Debugged cleanup issues
  • Found issue with UCVM install on Titan, rebuilt UCVM
  • Verified parallel version of reformat AWP code is faster (~3x) and correct

Today

  • Retry site with RotD insertion error
  • Finish restart verification
  • Test UCVM install when Titan returns

Blocked

  • Titan down for maintenance today

Follow-ups

  • HighF call

Areas of Responsibilities

  • CyberShake
  • Broadband CyberShake
  • Code migration