Difference between revisions of "Staff Priorities - Masha"

From SCECpedia
Jump to navigationJump to search
Line 3: Line 3:
 
=== Yesterday ===
 
=== Yesterday ===
 
* CSEP:
 
* CSEP:
** Reprocessed Oceanic Transform Faults failed 2 days on csep-op
+
** Responded to Peter Bird regarding his SHIFT_GSRM2f model submission
** Canterbury experiment: collect detailed info on why some raw catalogs are missing
+
** John built generic V15.1.0 image for Danijel and Thomas, started testing, it has NZ RPM installed, asked John to uninstall NZ RPM
** Got confused with CA cross-forecast group evaluation results, was debugging, figured out that was looking at different test case, no problem with code. Sent results to Max.
+
** Updated code base for Canterbury image
** Had review with Phil
+
** Ran cross evaluation with T and W tests of 1-day vs 1-month vs 1-year groups
** Contacted Max on when would be a good day to have Bayesian CSEP call
 
  
 
=== Today ===
 
=== Today ===
 
* CSEP:
 
* CSEP:
** Update code base for Canterbury image
+
** Responded to Anne Strader regarding model installation for Canterbury experiment
** T and W evaluation of 1-day forecast group for realtime catalog test case
+
** Examine cross T and W evaluation results, send to Max
** Set up configuration for cross forecast group evaluation for both test cases (realtime and best available catalogs)
+
** Run RELM tests evaluation resetting forecast start time for Canterbury experiment
** RELM tests evaluation resetting forecast start time
+
 
** Contacted John regarding generic V15.1.0 image for Danijel and Thomas
 
  
 
'''Blocked''': None
 
'''Blocked''': None

Revision as of 17:01, 24 March 2015

Current Activities

Yesterday

  • CSEP:
    • Responded to Peter Bird regarding his SHIFT_GSRM2f model submission
    • John built generic V15.1.0 image for Danijel and Thomas, started testing, it has NZ RPM installed, asked John to uninstall NZ RPM
    • Updated code base for Canterbury image
    • Ran cross evaluation with T and W tests of 1-day vs 1-month vs 1-year groups

Today

  • CSEP:
    • Responded to Anne Strader regarding model installation for Canterbury experiment
    • Examine cross T and W evaluation results, send to Max
    • Run RELM tests evaluation resetting forecast start time for Canterbury experiment


Blocked: None

Followups: None


TODO

  • Trac ticket #346: Evaluate Oceanic Transform Faults forecasts since 2012/01/01
  • Study Jeremy's Python code for Bayesian modeling

CSEP

EEW

Responsiblities