Difference between revisions of "Staff Priorities - Fabio"

From SCECpedia
Jump to navigationJump to search
Line 1: Line 1:
 
== Yesterday ==
 
== Yesterday ==
  
* GMSV call
+
* BBP server upgrade postponed 1 day
** 4 new codes coming early-mid July (Baker, Stewart, Rezaeian, Rathje)
+
* RMG
* BBP call with PM
+
** Most matlab code converted
** BBP on Gordon
+
** Missing SRF writing code
* BBP Trac now open thanks to JY
+
** Missing fast marching library conversion
* SG Rupture generator
 
** Converted gen_src.m to Python
 
  
 
== Today ==
 
== Today ==
  
 +
* BBP upgrade
 
* Run revised NGA-West 2 testing
 
* Run revised NGA-West 2 testing
 
* SG rupture generator
 
* SG rupture generator
 
** Continue Matlab-to-Python conversion
 
** Continue Matlab-to-Python conversion
* High-F plots for RG
+
** SRF writing code
* High-F wiki updates
+
** Fast marching library
 +
* Try logging into Gordon
  
 
== Blocked: ==
 
== Blocked: ==

Revision as of 17:03, 2 July 2015

Yesterday

  • BBP server upgrade postponed 1 day
  • RMG
    • Most matlab code converted
    • Missing SRF writing code
    • Missing fast marching library conversion

Today

  • BBP upgrade
  • Run revised NGA-West 2 testing
  • SG rupture generator
    • Continue Matlab-to-Python conversion
    • SRF writing code
    • Fast marching library
  • Try logging into Gordon

Blocked:

  • No

Followups:

  • No

To Do:

Short Term

Broadband Platform

  • Update GP rupture generator - Total: 3 days
    • Sent Rob parameters - done
    • Integrate code - 1 day
    • Run tests for Part-A / Part-B - 2 days
  • Anderson GoF code from AS - Total: 3 days
    • Analyze code, dependencies, provide AS feedback: 1 day
    • Convert code to BBP module, add module to BBP workflow: 1 day
    • Test BBP platform, produce new metrics: 1 day
  • New BBToolbox version available from SDSU - Total: 3 days
    • Incorporate SDSU changes into BBToolbox: 1 day
    • Run Part-A/Part-B validations: 2 days
  • NGA-West 2 validation on BBP - Total: 6 days
    • Contact CG, collect input scenarios: 1 day
    • Write test code: 1 day
    • Run tests: 2 days
    • Review results: 2 days
  • Setup laptop as EEW machine in software lab - Total: 1 day
    • Erase laptop, install clean Mac OS X, install EEW software: 1 day
  • Integrate Rupture Generator code from SG - Total: 28 days
    • Review code, understand inputs/outputs, run outside platform: 1 day
    • Run Part-A problem using Matlab code, review results: 1 day
    • Migrate code into BBP Platform, convert Matlab code into Python/C/Fortran, test: 20 days
    • Run Part-A/Part-B validation exercise on HPCC: 5 days (contingent on code performance)

High-F

  • Set up High-F code repository - Total: 3 days
    • Collect codes from groups, scripts - 1 day
    • Select SVN/Github repository - 1 day
    • Create repository - 1 day
  • Understand how to map station location to grid point - Total: 2 days
    • Understand approaches used by AWP and Hercules to map station location to grid point - 1 day
    • Discuss with PM, DG, how to use UCVM to do this mapping - 1 day

Medium Term

  • Package GF generation code from RG into BBP Platform
  • New raytracing code for SDSU method
  • Update Anderson method