Difference between revisions of "Staff Priorities - Kevin"

From SCECpedia
Jump to navigationJump to search
Line 1: Line 1:
8/3/15
+
8/4/15
  
 
== Yesterday: ==
 
== Yesterday: ==
* did spectral analysis on UCERF3-TD based synthetic catalogs
+
* first draft of supercycle AGU abstract, sent to Tom
* helped Ned speed up ETAS diagnostics code by ignoring contribution below a fractional threshold
+
* got UCERF3 synthetic catalogs into format required for synchronization analysis code (from masters thesis), ran analysis
* finished directivity model validation and regenerated CyberShake-OEF maps
+
* worked on 45 degree rotation algorithm to plot only data along the diagonal of recurrence plots
  
 
== Today: ==
 
== Today: ==
* pick AGU session and write first draft of abstract, send to Tom
+
* finalize AGU abstract with Tom, submit
* run simulator synchronization analysis on UCERF3-TD catalog
+
* register for SCEC annual meeting
** will require code rewrites to make synch code more general, get UCERF3 data into format which will work for simulators
+
* finish recurrence plot rotation work, make plots for UCERF3-TD
  
 
== Blocked: ==
 
== Blocked: ==
Line 15: Line 15:
  
 
== Followups: ==
 
== Followups: ==
no
+
* broadband cybershake call at 11:30
  
  
 
== Lower priority or longer term tasks ==
 
== Lower priority or longer term tasks ==
 
* Fill in missing site/rupture distances in CyberShake DB for ERF 36 (200m)
 
* Fill in missing site/rupture distances in CyberShake DB for ERF 36 (200m)

Revision as of 17:25, 4 August 2015

8/4/15

Yesterday:

  • first draft of supercycle AGU abstract, sent to Tom
  • got UCERF3 synthetic catalogs into format required for synchronization analysis code (from masters thesis), ran analysis
  • worked on 45 degree rotation algorithm to plot only data along the diagonal of recurrence plots

Today:

  • finalize AGU abstract with Tom, submit
  • register for SCEC annual meeting
  • finish recurrence plot rotation work, make plots for UCERF3-TD

Blocked:

no

Followups:

  • broadband cybershake call at 11:30


Lower priority or longer term tasks

  • Fill in missing site/rupture distances in CyberShake DB for ERF 36 (200m)