Difference between revisions of "Staff Priorities - Kevin"
From SCECpedia
Jump to navigationJump to searchLine 2: | Line 2: | ||
== Yesterday: == | == Yesterday: == | ||
− | * | + | * finalized AGU abstract with Tom, submitted |
− | * | + | * registered for SCEC annual meeting |
− | * | + | * finished recurrence plot rotation work |
+ | * generated new recurrence plots that are hybrid between threshold based plots and continuous plots | ||
+ | * generated new style plots for RSQSim and UCERF3, sent to Tom: "Kevin, These are so cool. I want them as wall paper for my office!" | ||
+ | ** Example: (warning large image): http://opensha.usc.edu/ftp/kmilner/simulators/recurrence_plots/SAF_MOJAVE_SAF_COACHELLA_SAF_CARRIZO/rotated/rp_LINFINITY_NORM_hybrid_thresh2.0_rotated.png | ||
== Today: == | == Today: == | ||
− | * | + | * submit SCEC abstract |
− | + | * read recurrence plot literature for help understanding them, implement metric described | |
− | * | ||
== Blocked: == | == Blocked: == | ||
Line 15: | Line 17: | ||
== Followups: == | == Followups: == | ||
− | + | no | |
== Lower priority or longer term tasks == | == Lower priority or longer term tasks == | ||
* Fill in missing site/rupture distances in CyberShake DB for ERF 36 (200m) | * Fill in missing site/rupture distances in CyberShake DB for ERF 36 (200m) |
Revision as of 17:35, 5 August 2015
8/4/15
Yesterday:
- finalized AGU abstract with Tom, submitted
- registered for SCEC annual meeting
- finished recurrence plot rotation work
- generated new recurrence plots that are hybrid between threshold based plots and continuous plots
- generated new style plots for RSQSim and UCERF3, sent to Tom: "Kevin, These are so cool. I want them as wall paper for my office!"
- Example: (warning large image):
Today:
- submit SCEC abstract
- read recurrence plot literature for help understanding them, implement metric described
Blocked:
no
Followups:
no
Lower priority or longer term tasks
- Fill in missing site/rupture distances in CyberShake DB for ERF 36 (200m)