*Wallclock time: 914.2 hours
 
*Wallclock time: 914.2 hours
 
*Uptime (not including downtimes): 641.6 hours (239.8 SCEC downtime, 32.8 Blue Waters downtime)
 
*Uptime (not including downtimes): 641.6 hours (239.8 SCEC downtime, 32.8 Blue Waters downtime)
*Upper bound of 3922 jobs submitted to the Blue Waters queue, based on project jobs run during this time. (REFINE THIS USING SHOCK WORKFLOW LOGS)
+
*3933 jobs submitted to the Blue Waters queue, based on Blue Waters jobs report
 
*Running jobs: average 10.8, max of 58
 
*Running jobs: average 10.8, max of 58
 
**On average, 10.2 XE jobs running, with a max of 57
 
**On average, 10.2 XE jobs running, with a max of 57
Line 358: Line 358:
 
**On average, 2.6 XE jobs idle, with a max of 49
 
**On average, 2.6 XE jobs idle, with a max of 49
 
**On average, 11.1 XK jobs idle, with a max of 40
 
**On average, 11.1 XK jobs idle, with a max of 40
*Nodes: average 1346 (43072 cores), max 5351 (171232 cores, 20%)
+
*Nodes: average 1346 (43072 cores), max 5351 (171232 cores, 20% of Blue Waters)
 
**On average, 795 XE nodes used, max 3895
 
**On average, 795 XE nodes used, max 3895
 
**On average, 551 XK nodes used, max 2400
 
**On average, 551 XK nodes used, max 2400
*Based on the Blue Waters portal, 655,541 node-hours charged but  (21.0M core-hours)
+
*Based on the Blue Waters jobs report, 955,900 used (24.7M core-hrs), but 648,577 node-hours (16.9M core-hrs) charged (50% charging period in effect from 4/17 to 5/15)  
**<?> XE node-hours
+
**XE: 589,568 node-hours (18.9M core-hrs) used, but 410,774 node-hours (13.1M core-hrs) charged
**<?> XK node-hours
+
**XK: 366,331 node-hours (5.86M core-hrs) used, but 237,802 node-hours (3.80M core-hrs) charged
  
  

Revision as of 19:17, 6 August 2015

CyberShake Study 15.4 is a computational study to calculate one physics-based probabilistic seismic hazard model for Southern California at 1 Hz, using CVM-S4.26, the GPU implementation of AWP-ODC-SGT, the Graves and Pitarka (2015) rupture variations with uniform hypocenters, and the UCERF2 ERF. The SGT calculations will be split between NCSA Blue Waters and OLCF Titan, and the post-processing will be done entirely on Blue Waters. The goal is to calculate the standard Southern California site list (286 sites) used in previous CyberShake studies so we can produce comparison curves and maps, and data products for the UGMS Committee.

Status

Study 15.4 began execution at 10:44:11 PDT on April 16, 2015.

Progress can be monitored here (requires SCEC login).

Study 15.4 completed at 12:56:26 PDT on May 24, 2015.

Data Products

Hazard maps from Study 15.4 are posted:

CyberShake PSHA Curves for UGMS sites

  • LADT 34.05204,-118.25713,390,2.08,0.31,358.648529052734
  • WNGC 34.04182,-118.0653,280,2.44,0.51,295.943481445312
  • PAS 34.14843,-118.17119,748,0.31,0.01,820.917602539062
  • SBSM 34.06499,-117.29201,280,1.77,0.33,354.840637207031
  • STNI 33.93088,-118.17881,280,5.57,0.88,268.520843505859
  • SMCA 34.00909,-118.48939,387,2.47,0.59,386.607238769531
  • CCP 34.05489,-118.41302,387,2.96,0.39,361.695495605469
  • COO 33.89604,-118.21639,280,4.28,0.73,266.592071533203
  • LAPD 34.557,-118.125,515,0,0,2570.64306640625
  • P22 34.18277,-118.56609,280,2.27,0.22,303.287017822266
  • s429 33.80858,-118.23333,280,2.83,0.71,331.851654052734
  • s684 33.93515,-117.40266,387,0.31,0.15,363.601440429688
  • s603 34.10275,-117.53735,354,0.43,0.19,363.601440429688
  • s758 33.37562,-117.53532,390,1.19,0,2414.40844726562

Science Goals

  1. Calculate a 1 Hz hazard map of Southern California.
  2. Produce a contour map at 1 Hz for the UGMS committee.
  3. Compare the hazard maps at 0.5 Hz and 1 Hz.
  4. Produce a hazard map with the Graves & Pitarka (2014) rupture generator.

Technical Goals

  1. Show that Titan can be integrated into our CyberShake workflows.
  2. Demonstrate scalability for 1 Hz calculations.
  3. Show that we can split the SGT calculations across sites.

Verification

Forward Comparison

More information on a comparison of forward and reciprocity results is available here.

DirectSynth

To reduce the I/O requirements of the post-processing, we have moved to a new post-processing code, DirectSynth.

A comparison of 1 Hz results with SeisPSA to results with DirectSynth for WNGC. SeisPSA results are in magenta, DirectSynth results are in black. They're so close it's difficult to make out the magenta.

2s 3s 5s 10s
WNGC SeisPSA v DirectSynth 2s.png
WNGC SeisPSA v DirectSynth 3s.png
WNGC SeisPSA v DirectSynth 5s.png
WNGC SeisPSA v DirectSynth 10s.png

2 Hz source

Before beginning Study 15.4, we wanted to investigate our source filtering parameters, to see if it was possible to improve the accuracy of hazard curves at frequencies closer to the CyberShake study frequency.

In describing our results, we will refer to the "simulation frequency" and the "source frequency". The simulation frequency refers to the choice of mesh spacing and dt. The source frequency is the frequency the impulse used in the SGT simulation was low-pass filtered (using a 4th order Butterworth filter) at.

All of these calculations were done for WNGC, ERF 36, with uniform ruptures and the AWP-ODC-GPU SGT code.

Comparisons were done using the following runs:

  1. 0.5 Hz simulation, 0.5 Hz filtered source (run 3837)
  2. 0.5 Hz simulation, 1 Hz filtered source (run 3853)
  3. 1 Hz simulation, 2 Hz filtered source (run 3860)
  4. 1 Hz simulation, 1 Hz filtered source (run 3861)

First, we performed a run with a 0.5 Hz simulation frequency and a 1.0 Hz source frequency, and compared it to the runs we had been doing in the past, which are 0.5 Hz simulation / 0.5 Hz source. The 1.0 Hz source frequency has an impact on the hazard curves, even at 3 seconds. Semilog curves are on the top row, log/log curves on the bottom.

0.5 Hz sim/0.5 Hz filtered in black, 0.5 Hz sim/1.0 Hz filtered in blue
0.5 Hz sim/0.5 Hz filtered in black, 0.5 Hz sim/1.0 Hz filtered in blue
0.5 Hz sim/0.5 Hz filtered in black, 0.5 Hz sim/1.0 Hz filtered in blue
0.5 Hz sim/0.5 Hz filtered in black, 0.5 Hz sim/1.0 Hz filtered in blue
0.5 Hz sim/0.5 Hz filtered in black, 0.5 Hz sim/1.0 Hz filtered in blue
0.5 Hz sim/0.5 Hz filtered in black, 0.5 Hz sim/1.0 Hz filtered in blue

From spectral plots of the largest 3 sec PSA seismograms, we can see that the PseudoAA response is affected, even at periods much higher than the filter frequency:

WNGG 0.5Hz source comparison 20 5 68 respect.png
WNGC 0.5Hz source comparison 20 5 68 fourier.png

Next, we repeated the same experiment for a 1.0 Hz simulation frequency and a 1.0 Hz and 2.0 Hz source frequency:

1 Hz sim/1 Hz filtered in black, 1 Hz sim/2 Hz filtered in blue
1 Hz sim/1 Hz filtered in black, 1 Hz sim/2 Hz filtered in blue
1 Hz sim/1 Hz filtered in black, 1 Hz sim/2 Hz filtered in blue
1 Hz sim/1 Hz filtered in black, 1 Hz sim/2 Hz filtered in blue
1 Hz sim/1 Hz filtered in black, 1 Hz sim/2 Hz filtered in blue
1 Hz sim/1 Hz filtered in black, 1 Hz sim/2 Hz filtered in blue
1 Hz sim/1 Hz filtered in black, 1 Hz sim/2 Hz filtered in blue
1 Hz sim/1 Hz filtered in black, 1 Hz sim/2 Hz filtered in blue

The hazard curves are practically the same. To try to understand why the hazard curves from the 1.0 Hz experiment don't show the same kind of differences we saw at 0.5 Hz, we first looked at the SGTs.

There is a clear difference in the spectral content of SGTs generated with different frequency content - you can see the different in these Fourier spectra plots, starting at about 1.0 Hz:

WNGC 1.0Hz source comparison 20 5 68 pt51540.png

The differences are also clear when examining the frequency content of a large-amplitude seismogram, starting around 0.7 or 0.8 Hz:

WNGC 1.0Hz source comparison 20 5 68 respect.png
WNGC 1.0Hz source comparison 20 5 68 fourier.png

However, these differences are about 2 orders of magnitude smaller in amplitude than the largest amplitudes, around 0.1 Hz. This is unlike the 0.5 Hz results, in which we see only about 1 order of magnitude difference. Additionally, we see these differences starting at about 0.7 or 0.8 Hz, so they are not picked up by the 2 second hazard curves. Part of the reason for this is because the source doesn't have a lot of high frequency content. Rob is investigating this for future updates to the rupture generator.

We also compared Respect and PSA results to verify the spectral response codes; there are some small differences at high frequency, but overall they are very similar:

WNGC 1.0Hz source comparison 20 5 0 respect.png
WNGC 1.0Hz source comparison 20 5 0 PSA.png

Using a 2 Hz filter does have small impacts on the seismograms; for example, here are plots of two of the largest seismograms for WNGC with a 1 Hz and 2 Hz source filter. The seismograms generated with the 2 Hz source filter have sharper peaks which are a results of their higher frequency content, but it should not be trusted, as the mesh spacing and dt of the simulation do not justify accuracy above 1 Hz:

WNGC 1.0Hz 20 5 68 seismogram comparison.png
WNGC 1.0Hz 19 6 47 seismogram comparison.png

So for non-frequency-dependent applications of seismograms generated with a 2 Hz source, they should be filtered.

Based on this analysis, we plan to perform Study 15.4 using a filter of 2 Hz, to capture additional frequency information between 0.7 and 1 Hz. We have updated the database schema so that we can capture the filter frequency used for various runs.

Blue Waters vs Titan for SGT calculation

SGT duration

The SGTs are generated for 200 seconds. However, the reciprocity calculations are performed for 300 seconds.

For Parkfield San Andreas events, the farthest sites are PTWN (420 km) and s758 (400 km). The seismograms for the northernmost events at those stations are below.

Pioneer Town, source 128, rupture 1296, variation 1035
s758, source 128, rupture 1296, variation 1035
Pioneer Town, source 89, rupture 2, variation 279
s758, source 89, rupture 2, variation 279

For Bombay Beach San Andreas events, the farthest site is DBCN (510 km).

Diablo Canyon, source 89, rupture 0, variation 700

Sites

We are proposing to run 336 sites around Southern California. Those sites include 46 points of interest, 27 precarious rock sites, 23 broadband station locations, 43 20 km gridded sites, and 147 10 km gridded sites. All of them fall within the Southern California box except for Diablo Canyon and Pioneer Town. You can get a CSV file listing the sites here.

Fig 1: Sites selected for Study 15.4 Purple are gridded sites, red are precarious rocks, orange are SCSN stations, and yellow are sites of interest.

Performance Enhancements (over Study 14.2)

Responses to Study 14.2 Lessons Learned

  • AWP_ODC_GPU code, under certain situations, produced incorrect filenames.

This was fixed during the Study 14.2 run.

  • Incorrect dependency in DAX generator - NanCheckY was a child of AWP_SGTx.

This was fixed during the Study 14.2 run.

  • Try out Pegasus cleanup - accidentally blew away running directory using find, and later accidentally deleted about 400 sets of SGTs.

We have added cleanup to the SGT workflow, since that's where most of the extra data is generated, especially with two copies of the SGTs (the ones generated by AWP-ODC-GPU, and then the reformatted ones).

  • 50 connections per IP is too many for hpc-login2 gridftp server; brings it down. Try using a dedicated server next time with more aggregated files.

We have moved our USC gridftp transfer endpoint to hpc-scec.usc.edu, which does very little other than GridFTP transfers.

SGT codes

  • We have moved to a parallel version of reformat_awp. With this parallel version, we can reduce the runtime by 65%.

PP codes

  • We have switched from using extract_sgt for the SGT extraction and SeisPSA for the seismogram synthesis to DirectSynth, a code which reads in the SGTs across multiple cores and then uses MPI to send them directly to workers, which perform the seismogram synthesis. We anticipate this code will give us an efficiency improvement of at least 50% over the old approach, since it does not require the writing and reading of the extracted SGT files.

Workflow management

  • We are using a pilot job daemon on Titan to monitor the shock queue and submit pilot jobs to Titan accordingly.
  • The MD5sums calculated on the SGTs at the start of the post-processing now run in parallel with the actual post-processing calculations. If the MD5 sum job fails, the entire workflow will be aborted, but since that is rare, the majority of the time the rest of the post-processing workflow can continue without having the MD5 sums in the critical path.

Codes

The CyberShake codebase used for this study was tagged "study_15_4" in the CyberShake SVN repository on source.

Additional dependencies not in the SVN repository include:

Blue Waters

  • UCVM 14.3.0
    • Euclid 1.3
    • Proj 4.8.0
    • CVM-S 4.26
  • Memcached 1.4.15
    • Libmemcached 1.0.18
    • Libevent 2.0.21
  • Pegasus 4.5.0, updated from the Pegasus git repository. pegasus-version reports version 4.5.0cvs-x86_64_sles_11-20150224175937Z .

Titan

  • UCVM 14.3.0
    • Euclid 1.3
    • Proj 4.8.0
    • CVM-S 4.26
  • Pegasus 4.5.0, updated from the Pegasus git repository.
    • pegasus-version for the login and service nodes reports 4.5.0cvs-x86_64_sles_11-20140807210927Z
    • pegasus-version for the compute nodes reports 4.5.0cvs-x86_64_sles_11-20140807211355Z
  • HTCondor version: 8.2.1 Jun 27 2014 BuildID: 256063

shock.usc.edu

  • Pegasus 4.5.0 RC1. pegasus-version reports 4.5.0rc1-x86_64_rhel_6-20150410215343Z .
  • HTCondor 8.2.8 Apr 07 2015 BuildID: 312769
  • Globus Toolkit 5.2.5

Lessons Learned

  • Some of the DirectSynth jobs couldn't fit their SGTs into the number of SGT handlers, nor finish in the wallclock time. In the future, test against a larger range of volumes and sites.
  • Some of the cleanup jobs aren't fully cleaning up.
  • On Titan, when a pilot job doesn't complete successfully, the dependent pilot jobs remain in a held state. This isn't reflected in qstat, so a quick look doesn't show that some of these jobs are being held and will never run. Additionally, I suspect that pilot jobs exit with a non-zero exit code when there's a pile-up of workflow jobs, and some try to sneak in after the first set of workflow jobs runs on the pilot jobs, meaning that the job gets kicked out for exceeding wallclock time. We should address this next time.

Computational and Data Estimates

Computational Time

Titan

SGTs (GPU): 1800 node-hrs/site x 143 sites = 258K node-hours = 7.7M SUs

Add 25% margin: 9.6M SUs

Blue Waters

SGTs (GPU): 1300 node-hrs/site x 143 sites = 186K node-hours (3.0M SUs), XK nodes

SGTs (CPU): 100 node-hrs/site x 143 sites = 14K node-hours (458K SUs), XE nodes

PP: 1500 node-hrs/site x 286 sites = 429K node-hours (13.7M SUs), XE nodes

Add 25% margin: 768K node-hours

Storage Requirements

Titan

Purged space to store SGTs while generating: (1.5 TB SGTs + 120 GB mesh + 1.5 TB reformatted SGTs)/site x 143 sites = 446 TB

Blue Waters

Space to store SGTs (delayed purge): 1.5 TB/site x 286 sites = 429 TB

Purged disk usage: (1.5 TB SGTs + 120 GB mesh + 1.5 TB reformatted SGTs)/site x 143 sites + (27 GB/site seismograms + 0.2 GB/site PSA + 0.2 GB/site RotD) x 286 sites = 453 TB

SCEC

Archival disk usage: 7.5 TB seismograms + 0.1 TB PSA files + 0.1 TB RotD files on scec-04 (has 171 TB free) & 24 GB curves, disaggregations, reports, etc. on scec-00 (171 TB free)

Database usage: (5 rows PSA + 7 rows RotD)/rupture variation x 450K rupture variations/site x 286 sites = 1.5 billion rows x 151 bytes/row = 227 GB (4.3 TB free on focal.usc.edu disk)

Temporary disk usage: 515 GB workflow logs. scec-02 has 171 TB free.

Performance Metrics

At 8:20 pm PDT on launch day, 102,585,945 SUs available on Titan. 831,995 used in April under username callag.

At 8:30 pm PDT on launch day, 257975.45 node-hours burned under scottcal on Blue Waters. 48571 jobs launched under the project on Blue Waters summary page.

After the runs completed:

  • Blue Waters reports 900,487.36 node-hours burned under user scottcal. 52493 jobs launched under the project on the Blue Waters summary page. In early August, Blue Waters reports 913,596 node-hours burned under scottcal, with nothing after late May.
  • Titan reports 81,720,256 SUs available, with 8,482,872 used in April and 14,337,692 used in May across the project. User callag used 5,167,198 in April and 8,453,124 in May.

Reservations

We launched 2 XK reservations on Blue Waters for 852 nodes each starting at 9 pm PDT on April 17th, and 2 XE reservations for 564 nodes each starting on 10 pm PDT on April 17th. Due to XK jobs having slower throughput than we expected, blocking the XE jobs, and Titan SGTs slowing down greatly, we gave back one of the XE reservations at 8:50 am PDT on April 18th.

In preparation for downtimes, we stopped submitting new workflows at 9:03 pm PDT on April 19th.

A set of jobs resumed on Blue Waters when it came back on April 20th; not sure why, since SCEC disks were still down. This burned an additional 19560 XE node-hours not recorded by the cronjob.

We resumed SGT calculations on Titan at 12:59 pm PDT on April 24th, and PP calculations at 4:34 pm PDT on April 24th.

We had Blue Waters reservations on the XK nodes from 4 pm on April 25th and on the XE nodes from 5 pm on April 25th until 2:30 pm on April 26th.

The Blue Waters certificate expired on April 27th at 12 pm PDT. The XSEDE cert expired on April 26th at 7 pm PDT. We turned off Condor on shock at 8 pm PDT on April 27th.

We turned Condor back on at 2:10 pm PDT on May 5th.

A reservation for 848 XK nodes on Blue Waters resumed at 12 pm PDT on May 7th, 564 XE nodes at 6 pm PDT on May 7th, and another 564 XE nodes at 7 pm.

We got another 848 XK nodes on May 16th at 8 am.

After the May 18 downtime (started at 4 am PDT), a reservation for 1128 XE nodes resumed at 9 am PDT on May 19th, and 1700 XK nodes at 8 am PDT on May 19th. We gave the XK reservations back at 6:30 pm PDT on May 20th.

I released 568 XE nodes at 2:42 pm PDT on May 21st. The other 560 XE nodes were released at 1 pm PDT on May 22nd.

Application-level Metrics

  • Makespan: 914.2 hours
  • Uptime (not including downtimes): 641.6 hours (239.8 SCEC downtime, 32.8 Blue Waters downtime)

Note: Uptime is what is used when calculating the averages for jobs, nodes, etc.

  • 336 sites
  • 336 pairs of SGTs
    • 131 generated on Titan (39%), 202 generated on Blue Waters (60%), 3 run on both sites for verification (1%)
  • <?> jobs submitted
  • On average, <?> jobs running, with a max of <?>
  • <?> node hours used (<?> core hours)


Blue Waters

  • Wallclock time: 914.2 hours
  • Uptime (not including downtimes): 641.6 hours (239.8 SCEC downtime, 32.8 Blue Waters downtime)
  • 3933 jobs submitted to the Blue Waters queue, based on Blue Waters jobs report
  • Running jobs: average 10.8, max of 58
    • On average, 10.2 XE jobs running, with a max of 57
    • On average, 0.7 XK jobs running, with a max of 3
  • Idle jobs: average 13.6, max of 53
    • On average, 2.6 XE jobs idle, with a max of 49
    • On average, 11.1 XK jobs idle, with a max of 40
  • Nodes: average 1346 (43072 cores), max 5351 (171232 cores, 20% of Blue Waters)
    • On average, 795 XE nodes used, max 3895
    • On average, 551 XK nodes used, max 2400
  • Based on the Blue Waters jobs report, 955,900 used (24.7M core-hrs), but 648,577 node-hours (16.9M core-hrs) charged (50% charging period in effect from 4/17 to 5/15)
    • XE: 589,568 node-hours (18.9M core-hrs) used, but 410,774 node-hours (13.1M core-hrs) charged
    • XK: 366,331 node-hours (5.86M core-hrs) used, but 237,802 node-hours (3.80M core-hrs) charged


Titan

  • Wallclock time: 896.2 hrs (from 10:44 PDT on 4/16/15 to 18:58 PDT on 5/23/15)
  • Uptime:
  • 439 pilot jobs run on Titan (91% automatic):
    • 128 PreSGT jobs (119 automatic, 9 manual)
    • 103 SGT jobs (97 automatic, 6 manual)
    • 108 PostSGT jobs (92 automatic, 16 manual)
    • 100 MD5 jobs (91 automatic, 9 manual)

Workflow-level Metrics

Job-level Metrics

Presentations and Papers

Science Readiness Review

Technical Readiness Review

Production Checklist

Preparation for production runs

  1. Check list of Mayssa's concerns
  2. Update DAX to support separate MD5 sums
  3. Add MD5 sum job to TC
  4. Evaluate topology-aware scheduling
  5. Get DirectSynth working at full run scale, verify results
  6. Modify workflow to have md5sums be in parallel
  7. Test of 1 Hz simulation with 2 Hz source - 2/27
  8. Add a third pilot job type to Titan pilots - 2/27
  9. Run test of full 1 Hz SGT workflow on Blue Waters - 3/4
  10. Add cleanup to workflow and test - 3/4
  11. Test interface between Titan workflows and Blue Waters workflows - 3/4
  12. Add capability to have files on Blue Waters correctly striped - 3/6
  13. Add restart capability to DirectSynth - 3/6
  14. File ticket for extended walltime for small jobs on Titan - 3/6
  15. Add DirectSynth to workflow tools - 3/6
  16. Implement and test parallel version of reformat_awp - 3/6
  17. Set up usage monitoring on Blue Waters and Titan
  18. Add ability to determine if SGTs are being run on Blue Waters or Titan
  19. Modify auto-submit system to distinguish between full runs and PP runs
  20. Science readiness review - 3/18
  21. Technical readiness review - 3/18
  22. Create study description file for Run Manager - 3/13
  23. Simulate curves for 3 sites with final configuration; compare curves and seismograms
  24. File ticket for 90-day purged space at Blue Waters
  25. Tag code on shock, Blue Waters, Titan
  26. Request reservation at Blue Waters
  27. Follow up on high priority jobs at Titan
  28. Make changes to technical review slides
  29. Upgrade UCVM on Blue Waters to match Titan version
  30. Evaluate using a single workflow rather than split workflows

See Also