Difference between revisions of "Staff Priorities - Scott"

From SCECpedia
Jump to navigationJump to search
Line 1: Line 1:
 
== Yesterday ==
 
== Yesterday ==
*Worked on BB CyberShake V&V, got test to pass
+
*Integrated wcc_siteamp14 into BB CyberShake, passed test
*Met with Brian Thomas at STL sci center
+
*Resubmitted pegasus-statistics, worked through a few issues with Karan
*Commented on SCEC AM abstract
+
*DB engine change completed overnight
*Submitted CyberShake AM abstract
+
*Started code to grab Vs30 from UCVM for high-frequency CyberShake  
  
 
== Today ==
 
== Today ==
*Integrate wcc_siteamp14 into BB CyberShake
+
*Finish Vs30 code, verify
 +
*Add loop for HF_Synth to work on entire rupture at a time
 
*Check on pegasus-statistics
 
*Check on pegasus-statistics
*Consider other options for database engine change
+
*Add foreign keys to PeakAmps table
*Create wrapper to grab Vs30 from UCVM for high-frequency CyberShake
 
  
 
== Blocked ==
 
== Blocked ==

Revision as of 17:14, 20 August 2015

Yesterday

  • Integrated wcc_siteamp14 into BB CyberShake, passed test
  • Resubmitted pegasus-statistics, worked through a few issues with Karan
  • DB engine change completed overnight
  • Started code to grab Vs30 from UCVM for high-frequency CyberShake

Today

  • Finish Vs30 code, verify
  • Add loop for HF_Synth to work on entire rupture at a time
  • Check on pegasus-statistics
  • Add foreign keys to PeakAmps table

Blocked

  • No

Follow-ups

  • No

Areas of Responsibilities

  • CyberShake
  • Broadband CyberShake
  • Code migration