Difference between revisions of "Staff Priorities - Fabio"

From SCECpedia
Jump to navigationJump to search
Line 1: Line 1:
 
== Yesterday ==
 
== Yesterday ==
  
* Re-ran wcc_siteamp comparison between 2009 and 2014 versions
+
* Posted constant Q Hercules results
** Sent results to RG
+
* KO mesh completed on BW
 +
** Sent WS pointer to mesh file
 
* High-F call
 
* High-F call
** Hercules team working on constant Q run
+
** Group review of data
** Kim ready for 3D runs
+
** KO to start 3D run
** Confirmed units with KO, RG
+
** RG will provide mesh documentation
** Trying to set mesh generation on BW
+
** RT has old etree for cvms-4.26
** Queued, ETA for start: tonight
+
** Contacted DG regarding etree creation on UCVM
* BBP activities list to PM, CG
+
* Finalized site amp run for Northridge
  
 
== Today ==
 
== Today ==
  
* Figure out units output on UCVM
+
* Call with JB @ 9am
* Continue runs for SR for Part-A events
+
* Run JB simulations on HPCC
* Contact JS regarding results for AS16 GMPE
+
* Send RG result for latest site amp run
* Call with PM, CG @ 2pm
+
* GMSV call @ 2pm
* Look into SGS rupture generator issue for misaligned SRF file
+
* Update trac tickets
* Run revised NGA-West 2 testing
 
  
 
== Blocked: ==
 
== Blocked: ==
Line 26: Line 26:
 
== Followups: ==
 
== Followups: ==
  
* BBP activities with PM, CG @ 2pm
+
* JB @ 9am
 +
* GMSV @ 2pm
  
 
== To Do: ==
 
== To Do: ==

Revision as of 17:14, 2 September 2015

Yesterday

  • Posted constant Q Hercules results
  • KO mesh completed on BW
    • Sent WS pointer to mesh file
  • High-F call
    • Group review of data
    • KO to start 3D run
    • RG will provide mesh documentation
    • RT has old etree for cvms-4.26
    • Contacted DG regarding etree creation on UCVM
  • Finalized site amp run for Northridge

Today

  • Call with JB @ 9am
  • Run JB simulations on HPCC
  • Send RG result for latest site amp run
  • GMSV call @ 2pm
  • Update trac tickets

Blocked:

  • No

Followups:

  • JB @ 9am
  • GMSV @ 2pm

To Do:

Short Term

Broadband Platform

  • Update GP rupture generator - Total: 3 days
    • Sent Rob parameters - done
    • Integrate code - 1 day
    • Run tests for Part-A / Part-B - 2 days
  • Anderson GoF code from AS - Total: 3 days
    • Analyze code, dependencies, provide AS feedback: 1 day
    • Convert code to BBP module, add module to BBP workflow: 1 day
    • Test BBP platform, produce new metrics: 1 day
  • New BBToolbox version available from SDSU - Total: 3 days
    • Incorporate SDSU changes into BBToolbox: 1 day
    • Run Part-A/Part-B validations: 2 days
  • NGA-West 2 validation on BBP - Total: 6 days
    • Contact CG, collect input scenarios: 1 day
    • Write test code: 1 day
    • Run tests: 2 days
    • Review results: 2 days
  • Setup laptop as EEW machine in software lab - Total: 1 day
    • Erase laptop, install clean Mac OS X, install EEW software: 1 day
  • Integrate Rupture Generator code from SG - Total: 28 days
    • Review code, understand inputs/outputs, run outside platform: 1 day
    • Run Part-A problem using Matlab code, review results: 1 day
    • Migrate code into BBP Platform, convert Matlab code into Python/C/Fortran, test: 20 days
    • Run Part-A/Part-B validation exercise on HPCC: 5 days (contingent on code performance)

High-F

  • Set up High-F code repository - Total: 3 days
    • Collect codes from groups, scripts - 1 day
    • Select SVN/Github repository - 1 day
    • Create repository - 1 day
  • Understand how to map station location to grid point - Total: 2 days
    • Understand approaches used by AWP and Hercules to map station location to grid point - 1 day
    • Discuss with PM, DG, how to use UCVM to do this mapping - 1 day

Medium Term

  • Package GF generation code from RG into BBP Platform
  • New raytracing code for SDSU method
  • Update Anderson method
  • Try logging into Gordon