Difference between revisions of "Staff Priorities - Fabio"
From SCECpedia
Jump to navigationJump to searchLine 1: | Line 1: | ||
== Yesterday == | == Yesterday == | ||
− | * | + | * Posted constant Q Hercules results |
− | ** Sent | + | * KO mesh completed on BW |
+ | ** Sent WS pointer to mesh file | ||
* High-F call | * High-F call | ||
− | ** | + | ** Group review of data |
− | ** | + | ** KO to start 3D run |
− | ** | + | ** RG will provide mesh documentation |
− | ** | + | ** RT has old etree for cvms-4.26 |
− | ** | + | ** Contacted DG regarding etree creation on UCVM |
− | * | + | * Finalized site amp run for Northridge |
== Today == | == Today == | ||
− | * | + | * Call with JB @ 9am |
− | * | + | * Run JB simulations on HPCC |
− | * | + | * Send RG result for latest site amp run |
− | * | + | * GMSV call @ 2pm |
− | * | + | * Update trac tickets |
− | |||
== Blocked: == | == Blocked: == | ||
Line 26: | Line 26: | ||
== Followups: == | == Followups: == | ||
− | * | + | * JB @ 9am |
+ | * GMSV @ 2pm | ||
== To Do: == | == To Do: == |
Revision as of 17:14, 2 September 2015
Contents
Yesterday
- Posted constant Q Hercules results
- KO mesh completed on BW
- Sent WS pointer to mesh file
- High-F call
- Group review of data
- KO to start 3D run
- RG will provide mesh documentation
- RT has old etree for cvms-4.26
- Contacted DG regarding etree creation on UCVM
- Finalized site amp run for Northridge
Today
- Call with JB @ 9am
- Run JB simulations on HPCC
- Send RG result for latest site amp run
- GMSV call @ 2pm
- Update trac tickets
Blocked:
- No
Followups:
- JB @ 9am
- GMSV @ 2pm
To Do:
Short Term
Broadband Platform
- Update GP rupture generator - Total: 3 days
- Sent Rob parameters - done
- Integrate code - 1 day
- Run tests for Part-A / Part-B - 2 days
- Anderson GoF code from AS - Total: 3 days
- Analyze code, dependencies, provide AS feedback: 1 day
- Convert code to BBP module, add module to BBP workflow: 1 day
- Test BBP platform, produce new metrics: 1 day
- New BBToolbox version available from SDSU - Total: 3 days
- Incorporate SDSU changes into BBToolbox: 1 day
- Run Part-A/Part-B validations: 2 days
- NGA-West 2 validation on BBP - Total: 6 days
- Contact CG, collect input scenarios: 1 day
- Write test code: 1 day
- Run tests: 2 days
- Review results: 2 days
- Setup laptop as EEW machine in software lab - Total: 1 day
- Erase laptop, install clean Mac OS X, install EEW software: 1 day
- Integrate Rupture Generator code from SG - Total: 28 days
- Review code, understand inputs/outputs, run outside platform: 1 day
- Run Part-A problem using Matlab code, review results: 1 day
- Migrate code into BBP Platform, convert Matlab code into Python/C/Fortran, test: 20 days
- Run Part-A/Part-B validation exercise on HPCC: 5 days (contingent on code performance)
High-F
- Set up High-F code repository - Total: 3 days
- Collect codes from groups, scripts - 1 day
- Select SVN/Github repository - 1 day
- Create repository - 1 day
- Understand how to map station location to grid point - Total: 2 days
- Understand approaches used by AWP and Hercules to map station location to grid point - 1 day
- Discuss with PM, DG, how to use UCVM to do this mapping - 1 day
Medium Term
- Package GF generation code from RG into BBP Platform
- New raytracing code for SDSU method
- Update Anderson method
- Try logging into Gordon