== Yesterday == | == Yesterday == | ||
− | * | + | * SCEC Lunch |
− | * | + | * Waiting for JB results |
− | ** | + | ** All LOMAP simulations completed |
− | * | + | ** All Landers simulations completed |
− | ** | + | *** GP only 42 realizations |
− | ** | + | *** Resubmitted GP Landers |
− | ** RG | + | ** Notified JB results available |
− | ** | + | * Posted GP site response module with bssa2014 model |
− | ** | + | ** Notified RG |
− | * | + | * Finalized integration of RZZ2015 and AS2016 metrics |
+ | ** Tested code for ExSIM, GP | ||
+ | * Received 3D Hercules results | ||
+ | ** Downloaded files from BW | ||
== Today == | == Today == | ||
− | * Call with | + | * Call with PM, TH about GIT setup |
− | * | + | * Monitor GP run on HPCC |
− | * | + | * Start GMSV slides |
− | + | * Process Hercules results | |
− | * | ||
* Continue work on BBP gauntlets | * Continue work on BBP gauntlets | ||
+ | ** Run codes with UCSB, SDSU, other Part-A events | ||
+ | ** Test codes with Part-B events | ||
== Blocked: == | == Blocked: == | ||
Line 27: | Line 31: | ||
== Followups: == | == Followups: == | ||
− | * | + | * PM, TH @ 10:30 GIT Setup |
− | |||
== To Do: == | == To Do: == |
Revision as of 17:08, 4 September 2015
Contents
Yesterday
- SCEC Lunch
- Waiting for JB results
- All LOMAP simulations completed
- All Landers simulations completed
- GP only 42 realizations
- Resubmitted GP Landers
- Notified JB results available
- Posted GP site response module with bssa2014 model
- Notified RG
- Finalized integration of RZZ2015 and AS2016 metrics
- Tested code for ExSIM, GP
- Received 3D Hercules results
- Downloaded files from BW
Today
- Call with PM, TH about GIT setup
- Monitor GP run on HPCC
- Start GMSV slides
- Process Hercules results
- Continue work on BBP gauntlets
- Run codes with UCSB, SDSU, other Part-A events
- Test codes with Part-B events
Blocked:
- No
Followups:
- PM, TH @ 10:30 GIT Setup
To Do:
Short Term
Broadband Platform
- Update GP rupture generator - Total: 3 days
- Sent Rob parameters - done
- Integrate code - 1 day
- Run tests for Part-A / Part-B - 2 days
- Anderson GoF code from AS - Total: 3 days
- Analyze code, dependencies, provide AS feedback: 1 day
- Convert code to BBP module, add module to BBP workflow: 1 day
- Test BBP platform, produce new metrics: 1 day
- New BBToolbox version available from SDSU - Total: 3 days
- Incorporate SDSU changes into BBToolbox: 1 day
- Run Part-A/Part-B validations: 2 days
- NGA-West 2 validation on BBP - Total: 6 days
- Contact CG, collect input scenarios: 1 day
- Write test code: 1 day
- Run tests: 2 days
- Review results: 2 days
- Setup laptop as EEW machine in software lab - Total: 1 day
- Erase laptop, install clean Mac OS X, install EEW software: 1 day
- Integrate Rupture Generator code from SG - Total: 28 days
- Review code, understand inputs/outputs, run outside platform: 1 day
- Run Part-A problem using Matlab code, review results: 1 day
- Migrate code into BBP Platform, convert Matlab code into Python/C/Fortran, test: 20 days
- Run Part-A/Part-B validation exercise on HPCC: 5 days (contingent on code performance)
High-F
- Set up High-F code repository - Total: 3 days
- Collect codes from groups, scripts - 1 day
- Select SVN/Github repository - 1 day
- Create repository - 1 day
- Understand how to map station location to grid point - Total: 2 days
- Understand approaches used by AWP and Hercules to map station location to grid point - 1 day
- Discuss with PM, DG, how to use UCVM to do this mapping - 1 day
Medium Term
- Package GF generation code from RG into BBP Platform
- New raytracing code for SDSU method
- Update Anderson method
- Try logging into Gordon