Difference between revisions of "Staff Priorities - Fabio"

From SCECpedia
Jump to navigationJump to search
Line 1: Line 1:
 
== Yesterday ==
 
== Yesterday ==
  
* High-F call
+
* Received High-F results from Hercules group
** AWP group will re-run simulations, send results
+
** Created updated comparison plots
* Contacted RG regarding mesh format document
+
** Sent results to NK and RT, ok to publish
* Trac 302: Matplotlib warnings: Fixed
+
** Updated wiki page with recent results
* Trac 313: Cluster scripts working on scec-00
+
* Mtg with DG regarding etree on BW
* Trac 303: RMG integration
+
** Extraction worked, but sort/merge failing due to memory issues
* Call with MH and JB regarding HPCC setup
+
* Ran Song method on BBP server for part-A events
** Setup and ready to go
+
** Fixed small issues, code is running now
* Added co-authors to AGU abstract
 
  
 
== Today ==
 
== Today ==
  
* Commit code to svn
+
* High-F Call
** Trac 302, 313
+
* Talk to SC regarding significant duration codes
* Continue integration of SGS rupture generator into BBP
+
* Move BBP snapshot to HPCC for Song method testing
 +
* Check Song method into svn
  
 
== Blocked: ==
 
== Blocked: ==
Line 23: Line 23:
 
== Followups: ==
 
== Followups: ==
  
* No
+
* SC @ 10:30am
 +
* High-F @ 11:00am
  
 
== To Do: ==
 
== To Do: ==

Revision as of 17:55, 6 October 2015

Yesterday

  • Received High-F results from Hercules group
    • Created updated comparison plots
    • Sent results to NK and RT, ok to publish
    • Updated wiki page with recent results
  • Mtg with DG regarding etree on BW
    • Extraction worked, but sort/merge failing due to memory issues
  • Ran Song method on BBP server for part-A events
    • Fixed small issues, code is running now

Today

  • High-F Call
  • Talk to SC regarding significant duration codes
  • Move BBP snapshot to HPCC for Song method testing
  • Check Song method into svn

Blocked:

  • No

Followups:

  • SC @ 10:30am
  • High-F @ 11:00am

To Do:

Short Term

Broadband Platform

  • Update GP rupture generator - Total: 3 days
    • Sent Rob parameters - done
    • Integrate code - 1 day
    • Run tests for Part-A / Part-B - 2 days
  • Anderson GoF code from AS - Total: 3 days
    • Analyze code, dependencies, provide AS feedback: 1 day
    • Convert code to BBP module, add module to BBP workflow: 1 day
    • Test BBP platform, produce new metrics: 1 day
  • New BBToolbox version available from SDSU - Total: 3 days
    • Incorporate SDSU changes into BBToolbox: 1 day
    • Run Part-A/Part-B validations: 2 days
  • NGA-West 2 validation on BBP - Total: 6 days
    • Contact CG, collect input scenarios: 1 day
    • Write test code: 1 day
    • Run tests: 2 days
    • Review results: 2 days
  • Setup laptop as EEW machine in software lab - Total: 1 day
    • Erase laptop, install clean Mac OS X, install EEW software: 1 day
  • Integrate Rupture Generator code from SG - Total: 28 days
    • Review code, understand inputs/outputs, run outside platform: 1 day
    • Run Part-A problem using Matlab code, review results: 1 day
    • Migrate code into BBP Platform, convert Matlab code into Python/C/Fortran, test: 20 days
    • Run Part-A/Part-B validation exercise on HPCC: 5 days (contingent on code performance)

High-F

  • Set up High-F code repository - Total: 3 days
    • Collect codes from groups, scripts - 1 day
    • Select SVN/Github repository - 1 day
    • Create repository - 1 day
  • Understand how to map station location to grid point - Total: 2 days
    • Understand approaches used by AWP and Hercules to map station location to grid point - 1 day
    • Discuss with PM, DG, how to use UCVM to do this mapping - 1 day

Medium Term

  • Package GF generation code from RG into BBP Platform
  • New raytracing code for SDSU method
  • Update Anderson method
  • Try logging into Gordon