Difference between revisions of "Staff Priorities - Fabio"

From SCECpedia
Jump to navigationJump to search
Line 1: Line 1:
 
== Yesterday ==
 
== Yesterday ==
  
* Received High-F results from Hercules group
+
* Posted High-F results from Hercules on wiki
** Created updated comparison plots
+
* High-F Call
** Sent results to NK and RT, ok to publish
+
* Follow-up with SC regarding SD codes in BBP and Cybershake
** Updated wiki page with recent results
+
* Updated acceptance test generator to match updated command-line interface
* Mtg with DG regarding etree on BW
+
* Added Song method to acceptance tests
** Extraction worked, but sort/merge failing due to memory issues
+
* Ran Part-B test for Song method
* Ran Song method on BBP server for part-A events
 
** Fixed small issues, code is running now
 
  
 
== Today ==
 
== Today ==
  
* High-F Call
+
* Review Part-B results obtained overnight on BBP server
* Talk to SC regarding significant duration codes
+
* Update cluster scripts to match revised command-line interface
* Move BBP snapshot to HPCC for Song method testing
+
* Create BBP snapshot and install on HPCC
* Check Song method into svn
+
* Run Part-B events on HPCC for Song Method
  
 
== Blocked: ==
 
== Blocked: ==
Line 23: Line 21:
 
== Followups: ==
 
== Followups: ==
  
* SC @ 10:30am
+
* No
* High-F @ 11:00am
 
  
 
== To Do: ==
 
== To Do: ==

Revision as of 21:58, 7 October 2015

Yesterday

  • Posted High-F results from Hercules on wiki
  • High-F Call
  • Follow-up with SC regarding SD codes in BBP and Cybershake
  • Updated acceptance test generator to match updated command-line interface
  • Added Song method to acceptance tests
  • Ran Part-B test for Song method

Today

  • Review Part-B results obtained overnight on BBP server
  • Update cluster scripts to match revised command-line interface
  • Create BBP snapshot and install on HPCC
  • Run Part-B events on HPCC for Song Method

Blocked:

  • No

Followups:

  • No

To Do:

Short Term

Broadband Platform

  • Update GP rupture generator - Total: 3 days
    • Sent Rob parameters - done
    • Integrate code - 1 day
    • Run tests for Part-A / Part-B - 2 days
  • Anderson GoF code from AS - Total: 3 days
    • Analyze code, dependencies, provide AS feedback: 1 day
    • Convert code to BBP module, add module to BBP workflow: 1 day
    • Test BBP platform, produce new metrics: 1 day
  • New BBToolbox version available from SDSU - Total: 3 days
    • Incorporate SDSU changes into BBToolbox: 1 day
    • Run Part-A/Part-B validations: 2 days
  • NGA-West 2 validation on BBP - Total: 6 days
    • Contact CG, collect input scenarios: 1 day
    • Write test code: 1 day
    • Run tests: 2 days
    • Review results: 2 days
  • Setup laptop as EEW machine in software lab - Total: 1 day
    • Erase laptop, install clean Mac OS X, install EEW software: 1 day
  • Integrate Rupture Generator code from SG - Total: 28 days
    • Review code, understand inputs/outputs, run outside platform: 1 day
    • Run Part-A problem using Matlab code, review results: 1 day
    • Migrate code into BBP Platform, convert Matlab code into Python/C/Fortran, test: 20 days
    • Run Part-A/Part-B validation exercise on HPCC: 5 days (contingent on code performance)

High-F

  • Set up High-F code repository - Total: 3 days
    • Collect codes from groups, scripts - 1 day
    • Select SVN/Github repository - 1 day
    • Create repository - 1 day
  • Understand how to map station location to grid point - Total: 2 days
    • Understand approaches used by AWP and Hercules to map station location to grid point - 1 day
    • Discuss with PM, DG, how to use UCVM to do this mapping - 1 day

Medium Term

  • Package GF generation code from RG into BBP Platform
  • New raytracing code for SDSU method
  • Update Anderson method
  • Try logging into Gordon