* Song RMG
 
* Song RMG
** Reviewed Part-B results on BBP server
+
** Created Unit test for Song RMG, inputs/outputs/test
** Reviewed Part-B results from HPCC
+
* Contacted KO, RT regarding new BBToolbox version
** Mw 5.5s ran fine, other crashed with memory errors
+
** Received updated version of BBToolbox
** DLEN=DWID=100 meters causes memory usage to climb to 30G
+
* Started BBToolbox integration
** Re-ran with 500m, then 400m, then 300m DLEN, DWID
+
* Responded to user requesting help with Virtual Box
** 300m starts to fail --> try reducing the number of jobs per node
 
* Contacted KO, RT regarding BBToolbox version
 
  
 
== Today ==
 
== Today ==
  
* Integrate latest BBToolbox version into BBP
+
* High-F call
* Unit test for RMG
+
* Check in Song RMG unit test
 +
* Continue BBToolbox integration into BBP
 
* Check-in updated cluster scripts into svn
 
* Check-in updated cluster scripts into svn
 
* Update trac tickets
 
* Update trac tickets
Line 25: Line 24:
 
== Followups: ==
 
== Followups: ==
  
* No
+
* High-F call @ 11am
 +
* SC @ 11:30am
  
 
== To Do: ==
 
== To Do: ==

Revision as of 21:29, 13 October 2015

Yesterday

  • Song RMG
    • Created Unit test for Song RMG, inputs/outputs/test
  • Contacted KO, RT regarding new BBToolbox version
    • Received updated version of BBToolbox
  • Started BBToolbox integration
  • Responded to user requesting help with Virtual Box

Today

  • High-F call
  • Check in Song RMG unit test
  • Continue BBToolbox integration into BBP
  • Check-in updated cluster scripts into svn
  • Update trac tickets
    • Add -ppn option to cluster scripts

Blocked:

  • HPCC Down: Cannot continue validation of Song RMG
  • UCVM etree: Need David to help debug sort/merge issue on BW

Followups:

  • High-F call @ 11am
  • SC @ 11:30am

To Do:

Short Term

Broadband Platform

  • Update GP rupture generator - Total: 3 days
    • Sent Rob parameters - done
    • Integrate code - 1 day
    • Run tests for Part-A / Part-B - 2 days
  • Anderson GoF code from AS - Total: 3 days
    • Analyze code, dependencies, provide AS feedback: 1 day
    • Convert code to BBP module, add module to BBP workflow: 1 day
    • Test BBP platform, produce new metrics: 1 day
  • New BBToolbox version available from SDSU - Total: 3 days
    • Incorporate SDSU changes into BBToolbox: 1 day
    • Run Part-A/Part-B validations: 2 days
  • NGA-West 2 validation on BBP - Total: 6 days
    • Contact CG, collect input scenarios: 1 day
    • Write test code: 1 day
    • Run tests: 2 days
    • Review results: 2 days
  • Setup laptop as EEW machine in software lab - Total: 1 day
    • Erase laptop, install clean Mac OS X, install EEW software: 1 day
  • Integrate Rupture Generator code from SG - Total: 28 days
    • Review code, understand inputs/outputs, run outside platform: 1 day
    • Run Part-A problem using Matlab code, review results: 1 day
    • Migrate code into BBP Platform, convert Matlab code into Python/C/Fortran, test: 20 days
    • Run Part-A/Part-B validation exercise on HPCC: 5 days (contingent on code performance)

High-F

  • Set up High-F code repository - Total: 3 days
    • Collect codes from groups, scripts - 1 day
    • Select SVN/Github repository - 1 day
    • Create repository - 1 day
  • Understand how to map station location to grid point - Total: 2 days
    • Understand approaches used by AWP and Hercules to map station location to grid point - 1 day
    • Discuss with PM, DG, how to use UCVM to do this mapping - 1 day

Medium Term

  • Package GF generation code from RG into BBP Platform
  • New raytracing code for SDSU method
  • Update Anderson method
  • Try logging into Gordon