10/13/15
+
10/15/15
  
 
== Yesterday: ==
 
== Yesterday: ==
* lots of ETAS runs and post processing for Ned and Morgan
+
* While profiling running simulations on stampede, found major bug in Ned's latest ETAS code that was causing simulations to hang. Basically a simulation could get stuck in an infinite loop if a rupture below a certain depth was triggered, which is rare but possible when running many simulations.
* XSEDE progress report and request for Phil
+
** implemented temporary non-ideal fix for current runs
* solicited John's help with keeping opensha.usc.edu working smoothly during disk downtime
+
** Ned working on long term fix
 +
* plots for latest runs
 +
* edits to XSEDE proposal
  
 
== Today: ==
 
== Today: ==
* more ETAS calculations for Ned in advance of Powell Center meeting next week
+
* help Ned with fix for EQ depth/infinite loop issue
* mine logs to see if my FastMPJ failure detection script is working. no un-caught failures so far, so we've either been lucky or the script is working
+
* post process/generate plots for 100yr runs which finished, send off to Morgan/Nicholas
* help Ned assemble plots needed for meeting next week
+
* merge in latest ETAS code from Ned for hopefully final batch of runs prior to Powell Center meeting
* work on figuring out runaway sequences
+
* post process results for scenario ETAS runs yesterday, send to Ned
  
 
== Blocked: ==
 
== Blocked: ==

Revision as of 16:59, 15 October 2015

10/15/15

Yesterday:

  • While profiling running simulations on stampede, found major bug in Ned's latest ETAS code that was causing simulations to hang. Basically a simulation could get stuck in an infinite loop if a rupture below a certain depth was triggered, which is rare but possible when running many simulations.
    • implemented temporary non-ideal fix for current runs
    • Ned working on long term fix
  • plots for latest runs
  • edits to XSEDE proposal

Today:

  • help Ned with fix for EQ depth/infinite loop issue
  • post process/generate plots for 100yr runs which finished, send off to Morgan/Nicholas
  • merge in latest ETAS code from Ned for hopefully final batch of runs prior to Powell Center meeting
  • post process results for scenario ETAS runs yesterday, send to Ned

Blocked:

no

Followups:

no


Lower priority or longer term tasks

  • Fill in missing site/rupture distances in CyberShake DB for ERF 36 (200m)
  • finish mapping of historical earthquakes to UCERF3 ruptures in order to run ETAS simulations of aftershock sequences