Difference between revisions of "Staff Priorities - Fabio"
From SCECpedia
Jump to navigationJump to searchLine 1: | Line 1: | ||
== Yesterday == | == Yesterday == | ||
− | * | + | * Winter Break |
− | |||
− | |||
− | |||
− | |||
− | |||
== Today == | == Today == | ||
− | * | + | * Respond to several e-mails |
− | * | + | ** software @ scec |
− | * | + | ** JB wants simulations |
− | * Look | + | * Call with RG |
− | * | + | ** Plot RWG data against other groups |
+ | ** Verify model obtained from RG with DG | ||
+ | * E-mail from SR with matlab code for GMPEs | ||
+ | ** Look into it and implement.. in preparation for workshop | ||
+ | * Create Part-A plots for SGS | ||
== Blocked: == | == Blocked: == |
Revision as of 18:10, 5 January 2016
Contents
Yesterday
- Winter Break
Today
- Respond to several e-mails
- software @ scec
- JB wants simulations
- Call with RG
- Plot RWG data against other groups
- Verify model obtained from RG with DG
- E-mail from SR with matlab code for GMPEs
- Look into it and implement.. in preparation for workshop
- Create Part-A plots for SGS
Blocked:
- No
Followups:
- No
To Do:
Short Term
Broadband Platform
- Update GP rupture generator - Total: 3 days
- Sent Rob parameters - done
- Integrate code - 1 day
- Run tests for Part-A / Part-B - 2 days
- Anderson GoF code from AS - Total: 3 days
- Analyze code, dependencies, provide AS feedback: 1 day
- Convert code to BBP module, add module to BBP workflow: 1 day
- Test BBP platform, produce new metrics: 1 day
- New BBToolbox version available from SDSU - Total: 3 days
- Incorporate SDSU changes into BBToolbox: 1 day
- Run Part-A/Part-B validations: 2 days
- NGA-West 2 validation on BBP - Total: 6 days
- Contact CG, collect input scenarios: 1 day
- Write test code: 1 day
- Run tests: 2 days
- Review results: 2 days
- Setup laptop as EEW machine in software lab - Total: 1 day
- Erase laptop, install clean Mac OS X, install EEW software: 1 day
- Integrate Rupture Generator code from SG - Total: 28 days
- Review code, understand inputs/outputs, run outside platform: 1 day
- Run Part-A problem using Matlab code, review results: 1 day
- Migrate code into BBP Platform, convert Matlab code into Python/C/Fortran, test: 20 days
- Run Part-A/Part-B validation exercise on HPCC: 5 days (contingent on code performance)
High-F
- Set up High-F code repository - Total: 3 days
- Collect codes from groups, scripts - 1 day
- Select SVN/Github repository - 1 day
- Create repository - 1 day
- Understand how to map station location to grid point - Total: 2 days
- Understand approaches used by AWP and Hercules to map station location to grid point - 1 day
- Discuss with PM, DG, how to use UCVM to do this mapping - 1 day
Medium Term
- Package GF generation code from RG into BBP Platform
- New raytracing code for SDSU method
- Update Anderson method
- Try logging into Gordon